$0.00

Novasit Thermocouple 33.5 Inch Long Lead
[910-588]

Novasit Thermocouple 33.5 Inch Long Lead
Novasit Thermocouple 33.5 Inch Long Lead
Call Us on 860-774-6100 if you require this part. Reviews
Manufacturers
Live Help

Available 9am-4pm
Search
 
Use keywords to find the product you are looking for.
Advanced Search
1 x LEVELING BOLT[4], CST/BRS LEG#   1/4-20 w/RUBBER TIPS
1 x Bulk50-hcs 5/16-18 X 1/2
1 x Accin Comb Box Insulation
1 x LOG, RIGHT TWIG - LS38 (#4)#
1 x Bulk25-ssscp5/16-18 X 3/8
1 x BACK HEAT SHIELD-TOP
1 x 59 : FRONT - BORDEAUX
1 x HANDLE (SPRING), A/C - BLACK#   3/8" id x 2.500" LONG
1 x GLASS RETAINER ASSY, 3n1 SML#   w/GLASS & GASKET
1 x Flex Line-30
1 x FASTENER - SCW 6 PK   THREAD CUTTING - 10-24 x 1/2"
2 x BURNER ASSY, DANCING FYRE#   33 DVi/CYPRESS/DVL GSR/GSR2
3 x Snap Disc Control (blower
1 x Hearth Brick Sc42 Servic
1 x HANDLE w/BRS CAM, BLK HDL#   BLACK SPRING HANDLE, 1988+
1 x Robertshaw Regulator - NG
1 x BURNER TUBE, 616 DF   DIAMOND FYRE 2013-2017
1 x Control Panel With Decal GF55
1 x BAF SUPRT, FRONT - ANS 84-87   440T 1983 (AKA A6-108)
1 x FASTENER - SCW 6 PK   THREAD CUTTING - 10-24 x 1/2"
1 x FIREBACK, CAST IRON LG PS/PI#   BRICK PATTERN - YNK-AST BY/AST
2 x GSKT, ROPE [50ft] 3/8" dia. BLACK   BULK - 50'
1 x AIR DEFLECTOR, BURNR(NG CYPRS)
1 x ASHPAN ASSY - LYDN/ARB   COMPLETE WD/PEL
1 x DIFFUSER UNIVERSAL   18 GA ALZ - 3.639 x 3.232
1 x Oak/tl3 Ss Brick Clip Set
1 x Dvgin 1-3/4 Fluplate-sale
1 x Side Trim Plate
1 x MOISTURE METER#   FIREWOOD MOISTURE
1 x AIR CONTROL LINKAGE   LEY/ARB WOOD & PELLET
1 x Advance Cast Brick Panel
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x Blower
1 x Track Bottom Ptd Assy
1 x BRASS MALE COMP FITTING
1 x AIRTUBE KIT, L-13 ANS/ANS-NT#   #39271, PAT #5001 & 1250/CMNO
1 x BLOWER ASSY LT - 864/564#   FAN KITS 99000156/99000162
1 x GLASS CLIP SCREWS (10), AVA #   10-24 x 1/2", BRASS/CAST DOORS
1 x P38 Circuit Board Upgrade
1 x CORD RESTRAINER - LRG (BLACK)   AC POWER CORD
1 x Accin Rghtwing-paint-sale
1 x Auto/Manual Fan Switch
1 x FASTENER - SCW 25 PK   HWSHSMS,#8 x 3/8" TYPE B
1 x SHAKER HANDLE MOUNT-SALES
1 x Acc/xxv Distribution Blwr
1 x PUSH PLUG, 1/4" dia, BLK   FWI/FXFRE
1 x Bracket, Brick Top Servic
1 x Clean Out Covers
1 x GLASS (POST MAY 06)
1 x COVER PLATE, OUTER 21TRV   ALL TRV MODELS
1 x GLASS, SMALL LOPI#   8-7/8 x15-3/8" GSKT NOT INCLD
1 x FASTENER - HEX NUT 5-PACK#   BRASS 3/8-16 - JAMB/TOP-LOCK
1 x WIRE HRNS, BLOWER, FWI #   FLUSH WOOD INS
1 x SENSOR/A350 CONTROL
1 x Thermostat - Low Voltage
1 x EMBERS, ROCK-WOOL 5 gram#
1 x CERAMIC BRICK RETAINERS   w/SCREWS - SET OF 2
2 x HANDLE (SPRING), A/C - BLACK#   3/8" id x 2.500" LONG
2 x Firebrick Lt Side Assy
1 x Adv-04/xxv Push Arm-sales
1 x Dvgin Pilot Cvr-rear-sale
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x GLASS, LPI SMALL, DOUBLE#   DOORS 81-86, 6.750" x 8.750"
1 x BRICK-CUT, 9 x 3-13/64
1 x Spacer
1 x Dvgin Xl Label Plate-sale
1 x FAN, FRONT MOUNT INS WOOD II*   ANSWER/REVERE/1250/1750
1 x Tube Scraper Rod
1 x Bulk100-fhn 5/16-18 Z 5
1 x AUGER DRIVE COLLAR, 1997 & UP   VARIOUS MODELS
1 x GLASS, AVALON SMALL#   5mm NEOCERAM - 10.125 x 17.094
1 x GLASS, LARGE LOPI#   5mm NEOCERAM - 9-7/8"x19-1/4"
1 x HNDLE KIT FL-WD w/ DR KNOBS   EXT ROD, w/ KNOB AND SCREW
1 x BLOWER w/MTNG PLATE#   21 RV/TRV's
1 x BURNER ASS'Y (EF) 21 TRV   SERVICE PART
1 x Hearth Ledge For Servic
1 x ACCESS DOOR BRKT, RIGHT   31/33/DVSGS/DVLGS
1 x # 37 burner orifice
1 x BLOWER, RT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x AIR DEFLECTOR, REAR (CYPRESS)
1 x DOOR CAM, LOPI - STAMPED STL#   1986-87 WOOD
1 x BLOWER, RT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x BURNER ASS'Y (EF), LP/NG#   2004 & UP DVL INSERT/ZC
2 x Round Ceramic Magnet (Each)
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x Ash Lip--Left
1 x BURNER O-RING 5-PK - #20   7/8" id x 1" od
1 x GSKT, 1/2" X 50' BLACK#   BULK - 50'
2 x MOISTURE METER#   FIREWOOD MOISTURE
1 x Grate Assy Painted
1 x Safety Relief Valve
1 x Left Side Brick Sc42 Ser
1 x Convection Fan
2 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x Decorative Ash Bed / Control Cover Kit (Six Pack)
1 x DIFFUSER UNIVERSAL   18 GA ALZ - 3.639 x 3.232
1 x Domestic Power Cord
1 x ROLL-PIN TOOL#   SERVICE PARTS
1 x Right Side Brick Sc42 Se
1 x BURNPOT, SS - SMALL 1991-2012#   PS/PI - A.K.A. FIREPOT
1 x Oak Rear Brick Retnr Set
1 x DIFFUSER, w/ SCWS   VARIOUS MODELS
1 x ADC HINGE BIN
1 x EMBERS, ROCK-WOOL 5 gram#
1 x Bracket Rheostat-s M L
1 x Clean Out Cover Plate
1 x 17-1/2IN FLAPPER-SALES
1 x HANDLE (WOOD), DOOR#   w/ SCW 1/4-20 x 1-1/4" BLK
1 x 1/2 Pipe Thread Drain Bin
1 x DOOR, AVA, MED BLK, SML HINGE   NO GLASS w/HANDLE (PEN/RAI)
1 x Scroll Three-Fold Screen
1 x Ash Lip--Center
1 x BRICK-CUT, 9 x 1-3/8#
2 x Advance Bright Nickel Doo
1 x (83529) Auger Pin 1
1 x MANTEL SHIELD*
1 x 1B : PIEZO IGNITION MODULE
2 x Vermiculite; Bag
1 x M55C-FS & FPI/MILAN/EMPRESS FPI 4 AMP SMALL FUSE IGNITOR
1 x 1/4" Silicone Tubing (15")
2 x Advance Bright Nickel Gri
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
1 x BRICK-CUT, 9 x 2-7/8" #
1 x RHEO w/OFF, 90v, RECT (MM)#   w/NUT & WASHER
1 x RHEO w/OFF, 90v, RECT (MM)#   w/NUT & WASHER
1 x HW PACK, PANEL - MOUNTING HW#   SCREWS & NUTS - UNIVERSAL
1 x ANDIRON, WROUGHT IRON*   864 & CLEAN FACE
1 x AUTO DRAFT CONTROL-SALES
2 x Fan Speed Controller Knob 99/00/01/02/03/04
1 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
1 x HANDLE (WOOD), DOOR#   w/ SCW 1/4-20 x 1-1/4" BLK
1 x Dvgin 2in Flue Plate-sale
1 x AUGER BUSHING PLT-UPR, LYD/ARB   SERVICE PART
1 x CONV PARTS, LP - 564 SS SIT   564SS GS1 ONLY
1 x SET OF CUT BRICK FOR 3500
1 x Tl/dvc/win Glass Clip-4
1 x 22 : WIRE HARNESS FEMALE-MILLIVOLT CONTROL
1 x 3/16 Rubber Spacer-10pack
2 x Set Of 7 Standard Bricks
1 x HANDLE (WOOD), DOOR - AVALON#   1/2" id x 4.169" LONG
1 x CONV PARTS, NG - SIT/PSE   33 DVi
1 x Burner Tube NG/LP 99/00/01/02/03/04
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x GLASS RETAINER w/GSKT, 3n1 LRG   DOOR GASKET ONLY, NO GLASS
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x Dvgin Flue Access Cvr-sal
1 x Faceplate Mounting Brackets Top - Oversize (Each) ***
1 x Drive Chain
1 x Manifold Pri Air-cdwl
1 x BRICK-CUT, 7"x 4-1/2" (#63)
1 x Digital Control Board
1 x GSKT, IGNITER MOUNT   42 APEX
1 x BURNER BRKT SET L/R   UPGRADE SNAP DISC PERFORMANCE
1 x LEVELING BOLT COVER, WD INSERT   VARIOUS INSERTS - 2-PK
1 x Cover Hopper GFI55
1 x BURNER FLR EMBER LT/RT - B52#   1 (SET) DVL INSERT 2009 (GS)
1 x GSKT, ROPE, DR 7/8" x 64" BLACK#   VARIOUS WOOD/PEL/GAS
1 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
1 x CONV PARTS, LP - SIT #   ALL/BERK/CDR/PRA/TOL/DVSZC-INS
1 x Southern Comfort 24", VF Logs, Concrete 1/2
1 x Combustion Fan Housing Gasket (motor to housing)
1 x KNOB (WOOD) w/ SCREW, BLK FWI#   3/8 i.d. w/HOLE - PAINTED BLK
1 x GSKT, GLASS 3/4" WIDE x 70"#   LOPI WOOD, PELLET & GAS
1 x DRAFT FLOW TUBE, 26" #   ALL PELLET FS & INSERTS
1 x SCREW-HWH TCS 10-24 X 3/4
1 x FIREBOX, CORNER WELD COVERS#   LIB/OLY/FREEBY
1 x DAMPER PLATE, NX GEN FW MED.   MED. FLUSH WOOD
1 x BLOWER, COMB, PELLET - LARGE#   2000 & UP, YANK/AST
1 x DOOR HANDLE ASS'Y, '84 DBL DR#   NON-CAM SIDE
2 x Pc45 Frnt Plate Lck-5 Pk
1 x BLOWER POWER CORD, w/RHEOSTAT#   UNI REAR/LPI FRT, NO FL/FR BAY
2 x AIR CONTROL SHUTTER, REAR   CYP,GRNFLD,864HO, 33DVi,DVLGSR
1 x KNOB (PHENOLIC), 3/4" dia   1/4-20 THREAD - BALL SHAPED
1 x Brkt-brick Support
1 x BLOWER STUD PLATE (2)   21 TRV
1 x DIFFUSER, w/ SCWS   VARIOUS MODELS
1 x Well Wel11a-601r
1 x Form Louver Door 400bdv W
1 x Glass Retainer
1 x BRICK, SET OF 8, FULL SIZE*
1 x 12 X 6 Tile Frame-brsh Ss
1 x Handle Mount Plate
1 x GLASS CLIP (4), AVA #   VARIOUS MODELS WD/GS/PEL
1 x Door Control Panel W/Hinge GF55/GFI55
1 x Adv-right Burn Pot Prot-s
1 x GSKT, ROPE, DR 7/8" x 64" BLACK#   VARIOUS WOOD/PEL/GAS
3 x Novasit Pilot orifice
1 x Proof of Fire Switch
1 x FASTENER - HEX NUT 5-PACK#   BRASS 3/8-16 - JAMB/TOP-LOCK
1 x Firebox Baffle
1 x Tadpole Rope Adv Cut-sale
1 x 2" Clearance Firestop Spacer (1 ea.)
1 x BRUSH, BOTTLE STYLE#   UNIVERSAL PS/PI
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
1 x Remote, Wireless Wall Mount, On/Off, Hi/Low, Electronic
1 x DOOR CAM,LOPI - BRASS#   88 &UP WOOD, 1990-96 PEL
1 x FASTENER - BOLT 5 PK   HHCS 1/4-20 x 1/2"
1 x CONCEALMENT COVER, 564 GS   SERVICE PARTS
1 x NG to LP Gas Conversion Kit
2 x Anti-Draft Shield for Round Top Only
1 x SF160 JACKET TOP-SALES
1 x CONV PARTS, NG - SIT#   864 TRV
1 x Ember Blaze Top Log 18
1 x GLASS RETAINER ASSY, 3n1 LRG#   w/ GLASS, GASKET & CLIPS
1 x KNOB (WOOD), SIDE A/C 5/16 id   AIR CONTROL (ASH/ALDER)
1 x ACCESS DOOR BRKT, RIGHT   31/33/DVSGS/DVLGS
1 x Glass Clip
1 x BURNER ASSY, REAR - 564 SS#   2007-2019
1 x Form Canopy 36 Mag/lo Ri
1 x BRKT HINGE ASSY, BTM 564/864   SET OF 2 - SEA/WIN VIC LACE
1 x POWER SUPPLY Y350R-1C
1 x EMPRESS FPI WIRING HARNESS
1 x 8-1/2X14-15/16 RECT GLASS
1 x 38/45/61/68 Fdr Cover-sal
1 x ROLL-PIN TOOL#   SERVICE PARTS
2 x 9B : PILOT LP
1 x HANDLE, DOOR 42 APEX
2 x T-stat Sensor W Wire Asse
1 x Louver Form 28.275 Vmi
1 x BYPASS TOOL, 42 APEX
1 x N/S : AIRTUBE FLANGE PLATE
1 x N/S : 1/4 FLAT WASHER (4 USED)
1 x 3500 JCKT SIDE W/O HOLE-S
1 x LEG REPAIR KIT - EVER/END/LIB#   LOPI 2020
1 x 24" GALVA TEMP LENGTH
1 x N/S : RHEOSTAT
1 x N/S : OUTSIDE AIR BOX COVER
1 x GSKT, 1/2" X 50' BLACK#   BULK - 50'
1 x HW PACK, IGNITER F/S vr.3   94400955
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x 8 : CS, HEX HD 1/4-20 X 1/2ININ GR5-BLK
1 x PULL RING, METALLIC BLACK #   PAINTED
1 x SIDE SHEILD, RT - LIB NEXGEN   RIGHT SIDE
1 x LEVELING BOLT[4], STEEL/PWR LEG#   w/RUBBER TIP - 3/8-16x1.5"
1 x N/S : PILOT SHIELD KIT-MILLIVOLT CONTROL
1 x Wood Knob & Bolt-2sets
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x N/S : ROCKWOOL
1 x Injector #55 (ref 37d0340
1 x GSKT, GLASS 3/4" WIDE x 70"#   LOPI WOOD, PELLET & GAS
1 x N/S : LAVA ROCK
1 x GRATE ANGLE-CAST
1 x DOOR HANDLE ASSY, LFW-FWP v.2   SR# SENSATIVE
1 x N/S : IGNITION MODULE-ELECTRONIC IGNITION.
1 x Glass Gasket - Flush Tadpole Type (Per Foot)
1 x BRICK, SET OF 8, FULL SIZE*
1 x FACE, FL WD MED TIMES SQUARE*
1 x AIRTUBE, ROLL PINS, PK OF 6#   1/4" dia. x 5/8"PLAIN STEEL
1 x DAMPER, SLDR, ENDEAVOR#   5" SQUARE w/2 SOCKETS
1 x FLUE ADAPTER, WD ADJ OFFSET*
2 x FASTENER - SCW 25 PK   HWSHMS,10-24x1/2 BLK - TYPE F
1 x BAF SUPRT, REAR "T" # � END/REV/ 380-NT/X-NT/1750
1 x DAMPER YOKE ASS'Y#   UNIVERSAL
2 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x 18.5 X 28.9 RECT GLASS
1 x AIR CONTROL ASSY, 1750/END/   380-NT
2 x Novasit Pilot Assembly - NG
1 x FASTENER - SCWS 8-PK GLS CLIP#   8-32 x 3/8" PH TORX TYPE F
1 x 20 : FLUE COVER - VERMONT CLASSIC GREEN
1 x 2 : RIGHT SIDE - FOREST GREEN
1 x 23 : DOOR - FOREST GREEN
1 x 2 : RIGHT SIDE - VERMONT GREEN
1 x 23 : DOOR - CLASSIC
1 x 22 : FRONT - VERMONT CLASSIC GREEN
1 x 12 : BACK
1 x 1 : TOP - BORDEAUX
1 x 18 : GRATE, WOOD
1 x BRICK, SET OF 8, FULL SIZE*
1 x BLOWER ASS'Y, RIGHT - FW#   FW/FWP/LFW INSERTS
1 x SS Burn Pot Liner
1 x DVGIN LEFT FACE-SALES
1 x STRAIGHT HOT WATER COIL
1 x GLASS w/GASKET - CEDAR FRONT#   11.500" x 11.500"
1 x GRILL, HEAT-DUCT KIT w/MOUNT   SCREWS
1 x OUTSIDE AIR KIT, WS/CAST PS*
1 x Combustion fan housinggasket (motor to housing)
1 x SNAP DISC BRACKET LG PS/PI   AST/YAK (PI & PS), ARB/LEY
1 x MIXING TUBE, 2000-08   BRK/TOL/PRA/CDR/35CB
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
1 x DOOR SWITCH, FPX WOOD#   BLWR CUT-OFF
1 x Valve Assembly Gasket
1 x THERMO-COUPLE (10Pk) - SIT#   USE w/SIT PILOT ONLY
1 x Bottom Inner-cdwl
1 x SPACER, 1/4 dia. x .312 - BLK   PACK OF 15
1 x MANUAL, CEDAR DVS FS - 2000
1 x Spring Lid/door-bbq/rvf
1 x Auger Stop Bracket 1
2 x FASTENER - KEPS NUT, 10 PK   8-32
1 x FACE SCREW, BLACK NICKEL   PHP 1"-1/4-20, BLK NKL - 4 PK
2 x GSKT, GLS 15/16x100" 302-B#   VARIOUS WOOD, PELLET & GAS
1 x HB38 30IN SCROLL DOOR
1 x INJECTOR, PILOT - LP (#35) #   USE w/SIT PILOT ONLY
1 x MANUAL, FL/LX/X 1984
1 x Outer Back Asy-enc Fb
1 x Insert Lifter-bni
1 x GLASS w/FRAME - 864 TRV vr.1   KEY LATCH - SR# up to 12394
1 x GLASS LATCH - FINGER-PULL#   vr.2, 2007+
1 x Outside Air Kit (4’’ I.D. x 10 ft. long insulated flex)
1 x BLOWER BRKT, RIGHT   T.O.L/BERK
1 x CONV PARTS, NG - SIT#   ALL/BERK/CDR/PRA/TOL/DVSZC-INS
1 x AIR CONTROL ASSY, COT/MIS BRN   COMPLETE ASSEMBLY
1 x BURNER FLOOR EMBER LFT/RHT#   1 (SET) DVS I (GS)
3 x 8 : CABLE CLIPS (TWO PER FIREPLACE)
1 x FLEX PIPE, 3/8"od x 24" BLK   22-1/2" - 24" LONG w/FITTINGS
1 x 13b : VALVE SIT 630.562 MP
1 x Refractory Brick Bracket
1 x BATTERY TRAY, COATED ("9v")   BRK/EDN/NOR/TOL/GRN/CYP/ GS
1 x BLOWER, CONV, UNIVERSAL#   VARIOUS GAS/PELLET/PHD KIT
1 x HB38 STOVE BLOWER ASY-SAL
2 x 7 : VALVE REGULATOR LP
1 x RETROFIT, SIDE SHIELD(2) 1750   REPUBLIC/SPOKANE
2 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x REMOTE, BLK WALL-MOUNT#   ALL GS/GSR/GSR2 MODELS
1 x DRYWALL FLANGE, 21E #   ELECTRIC FP
1 x Decorative Volcanic Stone
1 x Thermostat Extension
1 x Brkt Pilot For Service
1 x IGNITER COVER PLATE, FS WOOD   HEAT SHEILD
1 x FASTENER - SCW 25 PK   HWH SWAG, 10-24 x 3/8"
2 x 1 : PIEZO IGNITOR
1 x 3 POSITION ROCKER SWITCH
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x Ul Pellet Feeder Auger
1 x BRKT, ANDIRON - 1080   SET OF 2
2 x BLOWER, CONV, UNIVERSAL#   VARIOUS GAS/PELLET/PHD KIT
1 x AIRTUBE KIT, L-2 1988#   REPLACES WELDED TUBES
1 x Esp Probe-red/red
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x CABLE CLAMP, ROMEX   POWER CORD CLAMP
1 x BAF SUPRT, REAR "T" - FLEX-95   1989 - 1993
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x Caution Label-15 X 3 Blk
1 x N/S : TOP/BOTTOM INSULATION SC36
1 x HW PACK, PANEL - MOUNTING HW#   SCREWS & NUTS - UNIVERSAL
1 x ENAMEL TOUCH-UP - OXFORD BRN#   15 ml BOTTLE
1 x BRICK-CUT, 9 x 3-1/2 (#53)
1 x Roof Flashing 0 to 6/12 Pitch (30" Base)
1 x BEARING 3/8 ID X 1-1/8 OD
1 x 5 : FLUE COLLAR (8IN) - EBONY
1 x 12 X 6 Tile Frame-gold
1 x BLOWER BRKT ASS'Y, LEFT   BERK/PRA/CDR/ALEG/TOL
1 x BURNER ASSY, FRONT 564SS#   2007-2019
1 x AIR DEFLECTOR, NG - 864HO
1 x FLAME MOTOR, 564/21 ELEC#   SERVICE PARTS
1 x STOVE PACK, DVL (GSR) INS '09   SERVICE PART
1 x STEPPER MOTOR, NG GS2 4-PK#   1.6"-3.5" WC
1 x 3/8x1/2 Silicone Psa-20ft
1 x PILOT ELECTRODE COVER TUBE   SILICONE TUBE
1 x 4 : LEFT DOOR ASSEMBLY COMPLETE
1 x BLOWER ASSY RT - 864/564#   FAN KITS 99000156/99000162
1 x Bulk100-hcs 5/16-18 X 3/4
1 x DOOR LATCH TOOL
1 x MIXING TUBE SEAL PLATE   RADIANT
1 x BRKT, CONTROL VALVE   BERK/TOL/PRA
1 x EMBERS, ROCK-WOOL 5 gram#
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x HW PACK, BOLTS - FLUSH INSERT
1 x N/S : MAGNET
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x Hi-Temp Round Top with Louvered Screen
1 x Chain-60 Pin
1 x ANCHOR PLATE W/ DAMPER
1 x GSKT, AIR CNTRL - END/1750/REV   SERVICE PART
1 x CONV PARTS, NG - SIT   864 HO-GS/HO-NB
2 x N/S : SCREEN PULLS
1 x ACCENT LIGHT ASSY v.2 GAS INS#   DVS/DVL NO GSR2
1 x HW PACK, BLWR - REAR   WOOD STOVE-2
1 x GSKT, DOOR - 1/2" Dia, 70"#
1 x BLOWER, EDN/NOR#   FAN KIT 99000142
1 x ADC MOTOR MOUNT-SALES KB
1 x Bulk-pnd In Stud 8-32x3/4
1 x # 30 burner orifice
1 x BLOWER, RT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x # 33 burner orifice
1 x BURNER EF CAST BTM - LP/NG   BERK/PRA - 2005-07
1 x BURNER ASS'Y, EF - 864HO#   EMBERFYRE - NG - GS MDLS
1 x HW PACK, DOOR - LOPI 3-n-1   BLACK/BRASS/PEWTER - #405
1 x Fan Side Facia Left Metallic Black
1 x WIRE HRNS, MAIN   BK/GN/NR MV
1 x PUSH PLUG, 1/4" dia, BLK   FWI/FXFRE
1 x Weldment, Face Servic
1 x PRES RELIEF DOOR (1) 96-08'   DVSZC & VARIOUS FS GAS
1 x HB38 LEFT FRONT LOG
1 x HB38 REARVENT NG CONVERSI
1 x Feed Bushing - 2 Piece set
1 x CNTRL MODULE, 36CF/1080CF#   VER.1- non-ALPHA MODULE
2 x AIR CNTL ROD EXTENSION   INT/EXT THREAD - 4.438 x 3/8
1 x KNOB (WOOD) w/ SCREW#   A/C - ASH/ALDER
1 x AUGER BUSHING PLATE, UPPER #   1997 & UP PS/PI, LRG OR SML
1 x GLASS - SPOKANE#   (1250/1750) 15.397 x 9.215
1 x BRKT, FACE CONNECTORS L/R#   DVS /EF II/GS/31
1 x 5/8" Grommet--Cut
1 x 24" ULTRA TEMP LENGTH
1 x CNTRL MODULE, BRNR - GS1#   ALL GS1 MODELS
1 x GSKT (x4), BLWR MNT   42 APEX - RED SILICONE STRIPS
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x REMOTE RECEIVER, GS - SIT#   TIMED FAN FUNCTION
1 x BURNER, DVS EMBRFYRE W/LOG II*
1 x Tool Assembly
1 x CONTROL PANELw/ FUSE HOLDER   2-FUSE HOLDERS
1 x Caution&danger Label-10ea
1 x Embers - Bag
1 x MOISTURE METER#   FIREWOOD MOISTURE
1 x FASTENER - SCW BLACK 6 PK   PHPSMS, #8 x 3/8"
1 x HW PACK, LEG MNT BOLT   SET OF FOUR - BOLTS & WASHERS
2 x 5/32" Allen key
1 x Coastal Legs, Brushed Nickel
2 x GLASS RETAINER ASSY, 3n1 SML#   w/GLASS & GASKET
1 x BURNER PAN - REAR   430 GSR2
1 x GSKT, GLS 15/16x54" 302-B#   VARIOUS WOOD, PELLET & GAS
2 x Glowing Embers
1 x FASTENER - SCWS 8-PK GLS CLIP#   8-32 x 3/8" PH TORX TYPE F
1 x 36" GALVA TEMP LENGTH
2 x "B" Vent Transition Collar - 8" Chimney
1 x Brick Clip (Each)
1 x Exhaust Adapter Plate Weldment
1 x Vintage Red Brick Liner Kit 40
1 x 9 : NAILING FLANGE
1 x Wall Switch Kit, On/Off, White
1 x 88100 Exhaust Blower Gasket 1
1 x 10-2131-18 Ss Flex Hose
1 x 3/8 Od X 5/16 Oal-5 Pack
1 x 6" ULTRA TEMP LENGTH
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x BAF SUPRT, FRONT - FLEX-95   1989-93 (ANGLE)
1 x Fan Clip (Each)
1 x STOVE PACK, CAPE COD FWM   2019
1 x DIFFUSER, w/ SCWS   VARIOUS MODELS
1 x FASTENER - SCW BLK 6 PK#   WD DR HNDL, 1-1/4"x1/4-20
1 x 52 : 1/4-20 X 1IN STRIKER SCREW
1 x WIRE HRNS, GROUND - 8.25"   UNIVERSAL
1 x CORD RESTRAINER - LRG (BLACK)   AC POWER CORD
1 x GSKT ROPE, BLK - GLASS 3/8"x66"#   AVALON WOOD, PELLET & GAS
1 x Round Top with Mesh Screen - Black
1 x Remote, On/Off, Hi/Low, Electronic
1 x Duplex Receptacle - White
1 x Bracket, Mhs Lvr,right Bd
1 x 3 : INNER BACK
1 x Advance Grill-brsh Ss
1 x DOOR CAM,LOPI - BRASS#   88 &UP WOOD, 1990-96 PEL
1 x DOOR SHELL, LARGE BLK LOPI   w/ HARDWARE
1 x BRICK, SET OF 8, FULL SIZE*
1 x Piezo Kit Bracket Include
1 x BLOWER ASS'Y, RIGHT - 864HO#   SERVICE PART
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x Pb105 Harness-press Ign
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x AIRTUBE SLEEVE, 1 x 1.250od#   1 PER PACK
1 x BURNER ASS'Y, 564 HO#   EMBERFYRE
1 x N/S : DI-FACE BOLTS
1 x N/S : JUMP RING - WASHER USED ON HINGE PINS - FOR ENAMEL STOVES
1 x RHEOSTAT WHEEL - CAPE COD   FWP INSERT
1 x FAN, REAR MOUNT F/S WOOD II*
1 x 2 : DAMPER BRACKET
1 x GLASS CLIP SCREWS (10), AVA #   10-24 x 1/2", BRASS/CAST DOORS
1 x 36" ULTRA TEMP LENGTH
1 x EMBERS & LRG NUGGETS - WP/BF/ASCOT/EG40 POST '00
1 x SET-SCREWS, 3n1 DOOR KIT#   SET OF (2) 1/4-20 x7/16
1 x BLOWER, CONVECTION#   93-95BV,91-96PS/PI, 00 LRG PS
1 x FASTENER - HEX NUT#   STEEL 3/8-16 -JAMB-LOCK, 5 PK
1 x Advance Gold Grill
1 x FASTENER - BOLT PACK   BRICK RETAINER - CAST WOOD
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x Side Brick Bfc36 Service
1 x 12 X 6 Tile Frame-brt Nkl
1 x GSKT KIT, PILOT ASSY   FOR NON-GREENSMART UNITS
1 x Western Timber, 30" VF Log, Concrete
1 x Pf/pb Control Cover-sales
1 x SNAP DISC HOLE COVER   w/SCREWS & GSKT
1 x PILOT TUBE, 24" - PSE#   2 & 3-WAY PILOT ASS'Y
1 x Fdr -2cleanout W/gskt-2pk
1 x Ash Deflector
1 x Round Top with Louvers - Black
1 x DUAL BULB DOOR GASKET (10FT) LARGE EMBER NUGGETS ONLY
1 x GSKT TAPE, 1/4" X 1/16" WHT   10' BULK LENGTH
1 x Round Top with Mesh Screen
1 x 24 : TAVERN BROWN FIREBRICK-RIGHT SIDE
1 x GSKT, GLS 15/16x100" 302-B#   VARIOUS WOOD, PELLET & GAS
1 x EMBERS, ROCK-WOOL 5 gram#
1 x Terminal Block Housing
1 x MOISTURE METER#   FIREWOOD MOISTURE
1 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x 3-n-1 DOOR SHL HW SM/LG   HARDWARE ONLY
2 x 9B : PILOT NG
1 x FASTENER - HEX NUT 5-PK   1/4-20 - CENTER-LOCK
1 x AIR SHUTTER SLEEVE   VARIOUS MODELS
2 x N/S : FIRESCREEN RODS
1 x AIR DEFLECTOR, NG - 864 HO EF   EMBERFYRE BURNER - NG
1 x HEATER ASSEMBLY 21E#   SERVICE PARTS
1 x TRIM PLATE SPACER
1 x AIR DEFLECTOR PK, STONE KIT D   616 GSR & GSR2 - 94700728
2 x HANDLE w/BRS CAM, BLK HDL#   BLACK SPRING HANDLE, 1988+
1 x BRKT, CONTROL VALVE   BERK/TOL/PRA
1 x AC ADAPTER, 7v #   BASE GRN SMT APPLIANCES ONLY
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x TEMP METER - HANDHELD#   DIGITAL READER ONLY
1 x LOG, FRONT RIGHT - LS39 (#3)#
1 x HANDLE (SPRING), A/C - BRS #   3/8" id x 2.500" LONG
1 x AUGER MOTOR STOP - YANK-AST   LARGE PS/PI 2000 & UP
1 x BLOWER, CONV, UNIVERSAL#   VARIOUS GAS/PELLET/PHD KIT
1 x THERMO-PILE, 15"#   MV MODELS
1 x ASH DUMP SEAL PLATE, w/GUIDES   1997 AND UP PEL PS/PI
1 x Variable Speed with Thermo Snap Switch
1 x CONV PARTS, NG 564 SS SIT/PSE   564 SS-GS1/GS2 ONLY
2 x FLEX PIPE, 3/8 x 8-1/2#   w/ ORIFICE MANIFOLD
1 x GSKT, ROPE [50ft] 3/8" dia. BLACK   BULK - 50'
1 x BYPASS EXT ROD, OLY/FWS/M   w/ PULL RING, 5-3/4 x 3/8
1 x CONV PARTS, LP 564DF GSR2   DELUXE - 2014+
1 x HW PACK, LEVELING BOLTS (2)   3/8-16 x 1-1/2"
1 x BRKT, FACE CONNECTOR L/R - SET   DVLEF-II/DVLGS/33DVi
1 x SPACER, 1/4 dia. x .312 - BLK   PACK OF 15
1 x AIRTUBE KIT, L-14 ENDVR/REVRE#   (380-NT/X-NT) 1750
1 x BRKT SET (L/R) SFW   SMALL FLUSH WD
1 x #10 ID X 5/16OD X 3/8
1 x A/C ADAPTER, 1080/36 CF/EXTRM#   AF-4000ADP-24 / 7.5v
1 x REMOTE WALL MOUNT BRACKET#   w/SCRWS GRN SMRT GS
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x LEG KIT, SCULPTURED STEEL*
1 x LOG, FRONT RIGHT - LS16 #   HIDEAWAY
1 x ORIFICE, BURNER - No. 48   1.180" BRASS HXE (.076 dia)
1 x HEAT EXCHANGER SHIELD#   DVS/DVL/31/33 DVi
1 x Cast Door Hinge With Pin
1 x Buff Brick Liner Kit 35
1 x Valve Assembly Gasket
1 x HB38 RIGHT FRONT LOG
1 x Pilot Ods Tp Op# 8402
1 x PILOT ELECTRODE - SIT#   SENSING ELECTRODE - SIT PILOT
1 x NIPPLE, BARBED (PELLET)#
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x FASTENER - SCW, 5 PK NAME TAG   #10 x 3/8 RHW BLK ZINC
1 x CONV PARTS, LP - PSE   564 SS/DLUX - GSR2
1 x 16 : KNOB EXT ON/OFF-MILLIVOLT CONTROL
1 x CONV PARTS, NG - SIT#   HERT/SAL/36DVXL - EF
1 x BURNER RETROFIT, EF, CAST,v.2#   BERKSHIRE / PRAIRIE
1 x SET-SCREWS, 3n1 DOOR KIT#   SET OF (2) 1/4-20 x7/16
1 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x 17 : BLOWER ASSEMBLY
1 x HW PACK, BOLTS - FREEDOM BAY   #010
2 x Blower Wire Harness 6ft
1 x VALVE, NG w/MAN. H/L MV+TIMER   SIT 821.644 3.8-1.1 WC"
1 x STOVE PACK, 616 DF   DIAMOND FYRE - GSR2
1 x DOOR, HINGE PINS, BLACK#   2-PK, FS/INS
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x CONCEALMENT COVER, 564 GS   SERVICE PARTS
1 x FASTENER - HEX NUT 8-32 - 25PK   CENTER-LOCK - 8-32
1 x 30 Degree Offset and Return
1 x ASHLIP TRIM, SET SCREWS - 10pk#
1 x HANDLE ASSY, AVA w/BRASS CAM #   & WOOD HANDLE - COMPLETE
1 x CONTROL DOOR, MET BLACK   EDEN/NORTHFIELD
1 x Retainer, Brick Service
1 x MANTEL SHIELD*
1 x SNAP DISC HOLE COVER   w/SCREWS & GSKT
1 x LID CATCH-SALES
1 x DAMPER, YOKE ASSY, END/REV#   (380NT/X-NT), 1.9" x 4.5"
1 x Decorative Grill--Left Side
1 x SNAP-DISC - 120deg NO#   WOODSTOVE & INSERT
1 x DOOR RETAINER SCRWS(10)#   10-24 x 7/8" - 10PK
1 x ANDIRON, TRADITIONAL RING*   564 SS
1 x VENT, GAS INS 3/4 KIT J RD HW*   810001272
1 x LOG, RIGHT TWIG - LS39 (#6)#
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x BAFFLE, FIREBOX - SFW   12 GA SS304 - 21 x 8-5/8
1 x 7 : SCREEN WM36/WMR36/WM36A/WM36A-BRS(20IN.WX 183/8IN.H)
1 x GLASS w/GSKT -AVANTI, SDE 95#   1996 (SIDE) 3.799 x 10.399
1 x BLOWER ACCESS PLATE   616 GSR INSERT
1 x ANDIRON, WROUGHT IRON*   864 & CLEAN FACE
1 x DOOR, AVA, LRG BLK - NO GLASS#   w/HANDLE (OLY/1190/1196)
1 x 4a : ODS PILOT ASSEMBLY LP - MANUAL
2 x 9B : VALVE UV SIT 820.636 RP
2 x Inlet Air Collar Assy
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x MANIFOLD COVER PLATE, LP   DVL GSR/33 DVi/864HO/CYP/GRN
1 x Square Top with Mesh
1 x PILOT ORIFICE, LP - 0.014 PSE#   PSE PILOT ASSY
1 x GLASS CLIP (2), TOP/BOTTOM#   DVSZC/INS 1997-2001
1 x Flange,lt Side Srrnd-mnt
1 x BURNER ASS'Y (EF) GSR#   DVS/BRK/TOL- GSR-GSR2
1 x DRAW LATCH, DOOR/FLUE   w/ RIVETS - VARIOUS PEL/GAS
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x Fitting Elbow 90 Degree (Located At Orifice End)
1 x BLOWER
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x LOG, RIGHT TWIG - LS38 (#4)#
1 x BAF SUPRT, FRONT "S" # � END/REV/380-NT/X-NT - w/DFLCTR
1 x EcoFlow Conversion Kit, Electronic, Propane to Natural
1 x KNOB (PHNLC), 1" dia x 1.64   3/8-16 THREAD - TEARDROP SHAPD
1 x DIFFUSER, w/ SCWS   VARIOUS MODELS
1 x FASTENER - SCW 10 PK 3n1 DOOR#   LOPI WD - HWH SWAG 10-24 x 1"
1 x 7 : SCREEN WM42II42/WM42II-42A/HT/SX (22IN.W X 197/16IN.H)
1 x BLOWER ACCESS PLATE   616 GSR INSERT
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x SET-SCREWS, 3n1 DOOR KIT#   SET OF (2) 1/4-20 x7/16
1 x PILOT ELECTRODE, 24" - PSE#   PILOT FLAME SENSOR - PSE ONLY
1 x RPH MS 5/16-18 X 6
1 x EMBERS, ROCK-WOOL 5 gram#
1 x N/S : DI-FACE NUT
1 x Injector Rear #56 Lp
1 x DIFFUSER, w/ SCWS   VARIOUS MODELS
1 x SWITCH, ROCKER - 3 POS   LOPI 83-93 CHK AVAILABILITY
1 x KNOB, PHENLIC#   BLACK - 1" dia
1 x GLASS w/GASKET - DVS INSRT/ZC#   12-11/16" x 24-11/16"
1 x BURNER ASSY, REAR - 564 SS#   2007-2019
1 x HANDLE (SPRING), A/C - BLACK#   3/8" id x 2.500" LONG
1 x GLASS w/GSKT - SPIRIT/SPT BAY#   (FRONT)1996-01, 9.478 x 16.455
1 x GLASS, SMALL LOPI#   8-7/8 x15-3/8" GSKT NOT INCLD
1 x BLOWER BRKT PLATE - BRK/TOL   BRKT ONLY - NO HW
1 x AC PWR ADAPTER#   RADIANT I
1 x STEPPER MOTOR, LP GS#   GS1/GSR/GSR2 - 11"-2.9" WC.
1 x Spring Clip-20 Pack
1 x Grate Painted Assy Servic
1 x Touch up paint powder coat exterior
1 x BAF SUPRT, REAR "T" # � END/REV/ 380-NT/X-NT/1750
1 x DOOR CAM,LOPI - BRASS#   88 &UP WOOD, 1990-96 PEL
1 x BURNER, 564HO DANCINGFYR TRAD*
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x BRICK-CUT, 9 x 3-13/64
1 x RIVET COVER (DVL GSR/33i)   21.050 X 14.487
1 x BLOWER, CONV, UNIVERSAL#   VARIOUS GAS/PELLET/PHD KIT
1 x HW PACK, REMOTE - MOD LP GS   SERVICE PART
1 x PILOT ASSY, NG PSE 3-WY #   CYP/33/DVL/864HO - GSR2
1 x 15 DEGREE ELBOW KIT
1 x PULL RING, METALLIC BLACK #   PAINTED
1 x 18" Section Hi-Temp Double Wall Pipe Snap Lock
1 x HB38 REMOTE BLOWER ASY-SA
1 x DOOR ASS'Y, RT - TOL MAJ BROWN   CHECK AVAILABILITY
1 x BRICK RETAINER (2) w/SCW#   UNIVERSAL PART
1 x GSKT, GLS 15/16"x50ft. 302-B#   VARIOUS WOOD, PELLET & GAS
1 x BLOWER, COMB, PELLET - LARGE#   2000 & UP, YANK/AST
1 x BRKT SET, L/R - SFW   SMALL FLUSH WOOD
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x COVER PLATE, EXHST 21TRV   w/ GSKT AND SCREWS
1 x DOOR CAM, BRASS #   VARIOUS MODELS
1 x DAMPER EXT ROD/PULL RING, UNI#   8.188" LONG EXTENSION ROD
1 x TRANSMITTER, PF2 w/ AUX FUNCTION
1 x VALVE REGULATOR, LP SIT#   S.I.T. 907.204
1 x 30 DEGREE ELBOW KIT
1 x Plate Surround Side For S
1 x Bottom Slide Rod
1 x LEG KIT, SCULPTURED - PEWTER*
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x Handle Asy-sms,tl3,68,xxv
1 x FAN, REAR MOUNT F/S WOOD II*
1 x MANUAL, OWNERS CAPE COD FWM   2019
1 x CONV PARTS, LP - PSE   564 HONB-GSR2
1 x AUGER FLIGHT SPACER, 5PK#   CHECK SR#
1 x AIRTUBE, ROLL PINS, PK OF 6#   1/4" dia. x 5/8"PLAIN STEEL
1 x CONV KIT, NG 616 GSR2   SERVICE PART
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x Hi-Temp Round Top with Louvered Screen and Slip Section
1 x BLOWER STUD PLATE (2)   21 TRV
1 x Tl3 Linkage Hardware
1 x AIRTUBE KIT, L-6 FLEX-95 #   90-92 SR.#11604-14318
1 x FASTENER - KEPS NUT 5 PK   1/4-20
1 x AUGER MOTOR, ALL PS/PI#   EXCEPT 93-96 PI/AGP PS/PI
1 x 3-n-1 DOOR SHL HW SM/LG   HARDWARE ONLY
1 x MANTEL SHIELD*
1 x Lava - Bag
1 x MAGNET, 1/2" SUPER NEODYM BLK   10 PK - 1/2" DIA X 1/4" THICK.
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x Hi-Temp Round Top with Mesh Screen
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x BURNER, RADIANT LG   RADIANT LARGE
1 x BRKT, CONTROL VALVE   BERK/TOL/PRA
1 x 42" Mosaic Masonry™ Bi-Fold Door, Pewter Finish
2 x Novasit regulator
1 x BRICK-CUT, 9 x 3-5/8
1 x 3L : REAR LOG
1 x DAMPER, BYPASS- SLIDER#   REVERE(X-NT/ND), 1750-I
1 x BURNER O-RING 5-PK - #20   7/8" id x 1" od
1 x CONV PARTS, LP - SIT   HERT-EF/SAL-EF/36DVXL-EF
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x 30 Degree Firestop Spacer (1ea.)
1 x Top Ceramic Purchased(bfc
1 x BLOWER, CONV, UNIVERSAL#   VARIOUS GAS/PELLET/PHD KIT
1 x BLOWER, CONV, UNIVERSAL#   VARIOUS GAS/PELLET/PHD KIT
1 x Shroud Leg Spacer Kit (for UL approval of field fab term covers)
1 x GASKET, CHANNEL TAPE, 55" BLK   3/4" x 1/8" x 3/16"
1 x Novasit Electrode - Short
1 x Fem Term-vinyl Ins 25/pk
1 x Louver-strips-door(steel)
2 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x 12B : R/S (ON/OFF SWITCH)
1 x CNTRL/ACCESS DR ASS'Y - GSR2   DVS/DVL INSERT GSR-2 ONLY
1 x Firebrick Back Assy Servi
1 x 8 : PIEZO IGNITOR MANUAL
1 x FAN, RADIANT INSERT#   LARGE AND SMALL
1 x DOOR CAM, BRASS #   VARIOUS MODELS
1 x Quick Disconnect Pipe Weldment
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x ANCHOR PLATE
1 x BRICK-CUT, 9 x 3
1 x CONV PARTS, LP - PSE   DVL GSR2
1 x WIRE HRNS, FUSE GS2-GSR2 #   PRO-FLAME 2
1 x TOOL (PULL), LPI w/SPRNG HNDL#   BYPASS PULL TOOL
1 x Ash Pan Weldment - Leg Model
1 x INSULATED WALL THIMBLE
1 x GSKT, ROPE, DR 7/8" x 64" BLACK#   VARIOUS WOOD/PEL/GAS
1 x ANDIRON, TRADITIONAL RING*   564 SS
1 x BRICK-CUT, 9 x 3-7/8 #
1 x CONV PARTS, NG PSE 564 HO   HO GRR2/GSR SCR
1 x 18" ULTRA TEMP LENGTH
1 x BURNER ASS'Y, INNER - 864 ST   GS/GS2
1 x 1 : BRICK FILLER (4 PER F/P)
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x Pressure Relief Bolt Round Gasket (Each) 2 Per Unit
1 x 24" GALVA TEMP LENGTH
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x Hi-Temp Lg Pyramid Top w/Slip Section (use with all 8" systems)
1 x CLIP, FLOOR BRICK - 564SS   CLEAN FACE - GSR2
1 x AIR DEFLCTR - LFT EDN / NRFLD   w/SCREWS
1 x 4 : ODS PILOT ASSEMBLY NG - MANUAL
1 x DOOR CAM, BRASS #   VARIOUS MODELS
1 x STORM COLLAR
1 x ANCHOR PLATE
1 x MANUAL, FL/LX/X 1986-87
1 x Bulk100-fhn 1/4-20 Z 5
1 x ASHTRAP DOORS, (x2) PS/PI#   1997-2012 / LARGE OR SMALL
1 x Glass Clips & Hdwr-1 Set
1 x 36" Pipe Length
1 x DOOR, WASHER, .390 x .630 SS#   PK OF 8
1 x PILOT BRKT, w/ FASTENERS   NRTHFLD, EDN, 864HO
1 x BRKT, ACCENT LIGHT   616 GSR2
1 x Ul Fdr Snout Gasket-10 Pk
1 x Burner tube LP
1 x GLASS CLIP SET - 3-n-1 DOOR#   LOPI WOOD
1 x BLOWER, RT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x 1" Clearance Firestop Spacer ( 1ea.)
1 x Conversion Kit, Millivolt, Natural to Propane
1 x LOG, LEFT TWIG - LS1 #   1996-2000
1 x Refr Front Ash Lip 42
1 x RESTRCTR CNTRL ASSY   DVL/33 INSERT
1 x REMOTE, BLK WALL-MOUNT#   ALL GS/GSR/GSR2 MODELS
1 x 15 : PLUG BUTTON (GAS LINE) WM36/WM36A/WM42II-42A/HT/SX (3/4IN.
1 x UNIVERSAL WALL / RESUPPORT ASSY
1 x BURNER ASS'Y, EF - 864HO#   EMBERFYRE - NG - GS MDLS
1 x Roof Flashing 6/12 to12/12 Pitch
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x 19 : TOP LOUVER ASSEMBLY
1 x UNIVERSAL ROOF BRACE KIT
1 x HB38 GAS BRIDGE-SALES
1 x LEVELING BOLT COVER, WD INSERT   VARIOUS INSERTS - 2-PK
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x BLOWER, LT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x 1" Clearance Firestop Spacer ( 24ea.)
1 x BLOWER MOUNTING BRKT   1995-2000 GAS
1 x PILOT ELECTRODE - SIT#   SPARK ELECTRODE - SIT PILOT
1 x BLOWER BRKT PLATE - BRK/TOL   BRKT ONLY - NO HW
1 x SNAP-DISC - 120deg NO#   WOODSTOVE & INSERT
1 x COVER PLATE, OUTER 21TRV   ALL TRV MODELS
1 x LEVELING BOLT COVER, WD INSERT   VARIOUS INSERTS - 2-PK
1 x Square Top with Slip Section
1 x PILOT ASSY (5-Pk), NG PSE 2-WY#   UNIVERSAL
1 x Heat Exchange Baffle
1 x BRICK-FORMED STEEL, IGNITER - SFW   9 x 4-1/2" - formed steel
1 x ACCESS DOOR BRKT, RIGHT   31/33/DVSGS/DVLGS
1 x LOG, REAR - LS38 (#1)#
1 x 3/8 Od X 1/4 Oal-5 Pack
1 x Spacer Griddle Handle-def
1 x DIFFUSER UNIVERSAL   18 GA ALZ - 3.639 x 3.232
1 x WALL SUPPORT KIT
1 x AUDIO BOARD w/AUDIO PORT 21E#   SERVICE PARTS
1 x INSULATED TEE PLUG ONLY
1 x DOOR HINGE [x1]   AVA WD/AGP
1 x 20 : DOOR HANDLES (BOLT BAG) WM42II-42/WM42II-42S/HTS/SX-S
1 x KNOB (WOOD) w/ SCREW#   A/C - ASH/ALDER
1 x DEFLECTOR PACK - 430 GSR2   TRADITIONAL LOGSET
1 x CONV PARTS, LP - SIT #   ALL/BERK/CDR/PRA/TOL/DVSZC-INS
1 x Square Top with Slip Section - Black
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x Door Frame Only***
1 x AIRTUBE KIT, L-2 1988#   REPLACES WELDED TUBES
1 x BLOWER MOUNTING BRKT   1995-2000 GAS
1 x Full Skid Of Brick-sales
2 x Hearth Refractroy
1 x STEPPER, GSR LP CONV 4PK*   GSR2
1 x BRUSH, BENT HANDLE #   COMBUSTOR/FIREBOX BROOM
1 x VENT START COLLAR ASS'Y   616 GSR INSERT
1 x GSKT (1), GLASS CLIP, BOTTOM#   VARIOUS MODELS
1 x CONV PARTS, NG 564SS DX   GSR2 DLX SCR MODEL
1 x BLOWER-ASS'Y, LEFT - 864HO#   SERVICE PARTS
1 x BURNER, DVL EMBRFYRE W/LOG II*
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x TALL CONE FLASHING
1 x AIR CNTL ROD EXTENSION   INT/EXT THREAD - 4.438 x 3/8
1 x # 31 burner orifice
1 x BRICK-CUT, 9 x 2-7/16
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
1 x 22 : COTTAGE CLAY FIREBRICK-CENTER
1 x BURNER, RMA RETURN REQUIRED   1996-00, PAN ONLY - 40K
1 x Pc45 Bp Front Plate-2 Set
1 x BATTERY TRAY, GS - "AA"   SERVICE PART
1 x BOARD MOUNTING BRACKET   864 HH/ST
1 x CLIP, FIREBACK - 2 PK   VARIOUS MODELS
1 x HB38 RIGHT FLOOR BRICK
1 x GSKT, ROPE, DR 7/8" x 64" BLACK#   VARIOUS WOOD/PEL/GAS
1 x Variable Speed with Wall Switch
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x BI-METALIC DAMPER#   616 GSR/GSR2/4415/3615/6015
1 x PANEL, INSULATION - 3" x 10' #   Wood Burning Inserts
1 x PRES RELIEF DOOR w/ GSKT #   MULTIPLE GAS UNITS 1997 +
1 x GSKT CEMENT, 3oz. TUBE#   w/BRUSH - UNIVERSAL
1 x BRICK-CUT, 4-1/2 x 4-1/2
1 x PILOT ORIFICE, NG - 0.018 PSE#   NG PILOT ORIFICE
1 x PILOT SHIELD, 864HO-NB   DANCING/DIAMOND FYRE BURNER
1 x EMBERS, ROCK-WOOL 5 gram#
1 x BURNER ASS'Y, DF - REAR#   GSR-GSR2
1 x LOG, LEFT TWIG - LS1 #   1996-2000
1 x Burner Orifice # 50 - LP 99/00/01/02/03/04
1 x 30 DEGREE ELBOW KIT- GALVA TEMP
1 x CONV PARTS, LP - SIT   616 INSERT- GSR/GSR2
1 x CONV PARTS, NG - SIT/PSE   GS-GS2 - NORTHFIELD / EDEN
1 x Assy Bdv600 Face Textured
1 x 12" Section Hi-Temp Double Wall Pipe Snap Lock
1 x Burner tube NG
1 x 10 : SCREW NO.6X3/4 PPH YELLOW ZINC
1 x Split Stacked Warm Red Masonry Firebrick Walls
1 x ACCENT LIGHT v.1 DVL INS   DVL INS GSR TO SR# 3403-611520
1 x EZ TOP WITH SPARK ARRESTOR
1 x DOOR LATCH STRAP, G5/G11/G13/#   G16/G22 - OLD STYLE 1998' UNIT
1 x GLASS, SMALL LOPI#   8-7/8 x15-3/8" GSKT NOT INCLD
1 x Hopper Handle Pull
2 x GLASS RETAINER w/GSKT, 3n1 SML   DOOR GSKT ONLY
1 x BLOWER MOUNT PLATE - PHD   POWER HEAT DUCT
1 x BURNER, REAR LOG SHELF#   GAS FS - DV/BV 1996-99
1 x AIRTUBE KIT, L-3 1988-91#   REPLACES REMOVABLE TUBES
1 x Storm Collar (1 ea.)
1 x PULL RING, METALLIC BLACK #   PAINTED
1 x FASTENER - SCW 10 PK 3n1 DOOR#   LOPI WD - HWH SWAG 10-24 x 1"
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x BRKT, CONTL MODULE, INS GSR   DVS/DVL INSERT
1 x Junction Box Kit (Required with Blower)
1 x Fitting 1/8" Brass Pipe Adaptor (Located Between Elbows
1 x BURNER ASS'Y (EF)#   TOL/BERK (2005 - 2008)
1 x SET OF CUT BRICK
1 x SHL, TOP NRTHFLD NI   NEW IRON, RAD MV/GSR2 DLX
1 x Millivolt, Propane to Natural (SIT)
1 x GLASS GUARD LATCH TOOL
1 x HW PACK, LEG CLIP - MOBILE#   HOME INSTALLATION
1 x BLOWER BRKT, RIGHT   T.O.L/BERK
1 x Grate Scraper
1 x ASH DUMP PLATE, SMALL PS/PI   1997 AND UP
1 x HANDLE (SPRING), DOOR - BLACK#   1/2" id x 4.158" LONG
1 x BURNER, 564HO DIAMOND FYRE*
1 x CONV PARTS, NG RADIANT LARGE   RADIANT INS LARGE
1 x 36" ULTRA TEMP LENGTH
1 x CNTRL MODULE, REMOTE FUNCTN#   GSR2 MODELS
1 x Air Intake Gasket-set Of6
1 x BURNER RETROFIT - EF, v.1#   BRK T0 857740 / PRA TO 801307
1 x Bulk50-hcs1/4-20 X 1/2 G8
1 x GLASS RETAINER ASSY, 3n1 SML#   w/GLASS & GASKET
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x GSKT, GLASS 3/4"x50ft. 301-B#   ASHESIVE BACK, GLS GSKT
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x Low Profile Dual Blower II
1 x FASTENER - HEX NUT 5-PACK#   BRASS 3/8-16 - JAMB/TOP-LOCK
1 x VINYL SIDING STANDOFF
1 x ANDIRON, ARABESQUE*   864 & CLEAN FACE
1 x Pellet Power Cords W/ends
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x BURNER, 564HO EMBERFYRE W/LOG*
1 x MANUAL, FLEX-95 1989
1 x Round Top with Louvered Screen
1 x PILOT SHIELD - UNIVERSAL#   VARIOUS MODELS
1 x Injector Front#55lp
1 x Pressure Relief Door Back 99/00/01/02/03/04
1 x BRICK-WHOLE,9 x 4-1/2 x 1-1/4#   STANDARD FIREBRICK
1 x STEPPER MOTOR, LP GS#   GS1/GSR/GSR2 - 11"-2.9" WC.
1 x CONV PARTS, NG - RS   93-95 BV/DVSZC-INSRT 96-00
1 x Standard Single Speed
1 x BLOWER, CONV, DVL FS '98 & UP#   SALISH/HERITAGE 1998-2009
1 x BLOWER BRKT ASS'Y, LEFT   BERK/PRA/CDR/ALEG/TOL
1 x BURNER ASS'Y (EF)#   EDEN / NORTHFIELD
1 x GSKT, GLS 15/16x100" 302-B#   VARIOUS WOOD, PELLET & GAS
1 x HW PACK, PANEL - MOUNTING HW#   SCREWS & NUTS - UNIVERSAL
1 x BLOWER ASSY LT - 864/564#   FAN KITS 99000156/99000162
1 x Barb Fitting
1 x DOOR HINGE [x1]   AVA WD/AGP
1 x Firestop Thimble (Use when offsetting through a joist)
1 x 36" Section Hi-Temp Double Wall Pipe Snap Lock
1 x PILOT ASSY (5-Pk), NG PSE 3-WY   CYP/33/DVL/864HO - GSR2
1 x GSKT, BYPASS, KAOWOOL#   REVERE/X-NT /1750
1 x AUGER ASS'Y, SMALL PS/PI   1997-12, 1-1/4" PITCH FLIGHT
1 x Outside Air Adapter Box for 17-VL
1 x Round Top with Slip Section & Louvers
1 x BLOWER BRKT PLATE - BRK/TOL   BRKT ONLY - NO HW
1 x Firescreen Panel W/ Pull
1 x FIREBOX, CORNER WELD COVERS#   LIB/OLY/FREEBY
1 x GLASS, AVALON LARGE#   5mm NEOCERAM - 10.125 x 19.000
1 x HW PACK, PANEL - MOUNTING HW#   SCREWS & NUTS - UNIVERSAL
1 x Square Top
1 x HW PACK, LEVELING BOLTS (2)   3/8-16 x 1-1/2"
1 x BATTERY TRAY, GS - "AA"   SERVICE PART
1 x N/S : REAR LOG
1 x ORIFICE/MNIFLD ASS'Y, 864TRVGS   w/#49 NG ORIFICE
1 x GSKT, WIRE PLATE   VARIOUS UNITS - 2" x 1-1/4"
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x LOG, RIGHT REAR - LS29 #   21 TRV
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x BRKT, FACE CONNECTOR L/R - SET   DVLEF-II/DVLGS/33DVi
1 x Screen Uvs27
1 x CONV PARTS, LP - SIT/PSE   33DVi / CYPRESS-GS
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x AIR DEFLECTOR - NG - 33 DVi   33 & DVL DF BURNER
1 x INJECTOR, PILOT - LP (#35) #   USE w/SIT PILOT ONLY
1 x N/S : RIGHT MIDDLE LOG
1 x LOG SET, LS29 - 4 PIECE#   21 TRV
1 x MAGNET w/SHEATH   1.000 x .750" 1/4" THICK
1 x Pilot Ods Rn Mv Op#841182
1 x GSKT, FLUE COLLAR   VARIOUS MODELS
1 x LOG SPACER, LP - 21TRV   GS/GSR2
1 x CONVECTION DUCT (DVL GSR/33i)   w/ FASTENERS
1 x NAILING BRACKET 21 DV   7.639 x 2.000
1 x Pilot Burner Assy Nat(op8
1 x Orifice Hood ( 0465) V#04
1 x Orifice Hood Lp #69(0 029
1 x Firebrick Rt Side Assy
1 x PILOT ASSY, NG - S.I.T. #   PRE GREENSMART
1 x BRICK RETAINER (2) w/SCW#   UNIVERSAL PART
1 x MANUAL, DVL FIREPLACE EF 2003
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x GLASS, 1/4 CRUSHED BLK 10LBS*
1 x GLASS w/FRAME - 616   616 GSR INSERT
1 x GLASS, 1/4 CRUSHED CBLT 10LBS*
1 x AIR CONTROL ASSY, 2006-12   ANS-NT/ND & 1250/i
1 x GLASS LATCH - FINGER-PULL#   vr.2, 2007+
1 x SCREEN, CLEARFIRE, FRONT CYP/GRNFLD   24.500 x 16.250
1 x BURNER ASS'Y, EF - 864HO#   EMBERFYRE - NG - GS MDLS
1 x RUBBER MOTOR STOP - 2-PK#   ALL PELLET - 1990 to PRESENT
1 x KNOB (PLASTIC), RHEOSTATS #   BLACK w/WHITE LINE - GAS/WOOD
1 x VALVE REGULATOR, NG RS#   ROBERT SHAW (0.9-3.5")
1 x AIR DIVERTER, 864 TRV   GS2/GSR2
1 x HW PACK, BLOWER 564/864   FOR NON-GS MODELS ONLY
2 x SHL, SIDE LT, GREENFLD Scr OXB   OXFORD BROWN w/SCREEN
1 x FLEX PIPE, 3/8"od x 28" BLACK   NO-FITTINGS
1 x LOG SET, LS31 - 9 PIECE   864 ST
1 x INJECTOR, PILOT - NG (#62)#   USE w/SIT PILOT ONLY
1 x PIEZO IGNITER, ALL mv GAS UNITS #   w/ RETAINING NUT
1 x GSKT, GLS 15/16x54" 302-B#   VARIOUS WOOD, PELLET & GAS
1 x KNOB, PHENLIC#   BLACK - 1" dia
1 x GLASS w/GASKET - DVS F/S FRONT   VASHON/ALLEGIANCE
1 x EXHST/INTAKE CVRS w/GSKTS   w/FASTENERS - 564
1 x DIFFUSER UNIVERSAL   18 GA ALZ - 3.639 x 3.232
1 x VALVE REGULATOR, NG RS#   ROBERT SHAW (0.9-3.5")
2 x SHL, TOP, GRNFLD - PATNIA BRNZ   PATINA BRONZE
1 x CNTRL MODULE, BASIC FUNCTION#   GSB2 MODELS
1 x WIRE HRNS, ACCENT LIGHT   616/430 EG MDLS
1 x HW PACK, REMOTE - MOD LP GS   SERVICE PART
1 x DAMPER BLOCK OFF COVER (1)   w/ FASTENERS
1 x BRUSH, BOTTLE STYLE#   UNIVERSAL PS/PI
1 x ANDIRON, WROUGHT IRON*   864 & CLEAN FACE
1 x MILL-PAC BLACK HI-TEMP SEALANT   1-TUBE, (10.3oz)
1 x HINGE PIN, DOOR BLK 4-PK   3/16 x 1-1/2
1 x PIPE ADAPTER-3/8FLRx1/2NPT   BRS 45deg FLRD(FEML PIPE THRD)
1 x OUTSIDE AIR KIT, WS/CAST PS*
1 x LOG, LEFT - LS13 #   36DVXL EF/EF2/HERT EF2/864HH
1 x GSKT, INTAKE - 864   864 HH/ST/TRV
1 x PILOT ELECTRODE SLEEVE, BLK#   BULK LENGTH - 6 FEET
1 x GSKT, DOOR 7/8" x 50' BLACK#   ROPE - MISC. GAS/WOOD/PELLET
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x BRKT, FACE MNTNG - L/R#   DVS/31
1 x GRMT/SPACER (4) - BLOWER#   1997+ PEL/1995+ GAS
1 x BEARING HOLDER, FUEL MTR#   AUGER ASSY
1 x RESTRICTOR PLATE, INTAKE - EF   EMBER FYRE - 564HO
1 x STUD PLATE - SIDE GLASS CLIP   SPDV/SPTBAY
1 x SHL, TOP, GRNFLD CRBN PATINA   CARBON PATINA
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x LOG, RIGHT - LS13 #   36DVXL EF/EF2/HERT EF2/864HH
1 x LOG, EMBER CHCK #10, LFT LS63#   DRIFTWOOD
1 x RHEO w/OFF, SQUARE(MM)#   w/NUT & WASHER
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x GLASS w/FRAME - 21 TRV   SERVICE PART
1 x THERMO-PILE - SIT #   SIT PILOT 1999-2009
1 x THERMO-COUPLE - RS #   DV 95 & UP, B-VENT 96 & UP
1 x RESTRICTOR PLATE EXHAUST 564   SS/DF SERVICE PARTS
1 x RHEO w/OFF ASS'Y, SQUARE(FM)#   1-FEMALE, 1-MALE CONNECTOR
1 x DEFLECTOR PACK, 864HO EF#   96900144 - EF BURNER KIT
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x WIRING KIT, INSERTS*   GAS OR PELLET
1 x BLOWER, CONV, UNIVERSAL#   VARIOUS GAS/PELLET/PHD KIT
1 x REMOTE, BLK WALL-MOUNT#   ALL GS/GSR/GSR2 MODELS
1 x BRKT, FACE, BTM (564/864)   SET OF 2 - WILMINGTON
1 x GSKT TADPOLE,3/8 x3/4 PSA BLK#   12' BULK LENGTH
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x SPACER, BLACK - INTAKE SHUTR   5-PK
2 x SHL, LEG, BRKSHR/GRNFD BRZ   BRONZE PATINA
1 x WIRE HRNS, JUMPR-REMOTE GSR-2#   PRO-FLAME 2
1 x VALVE REGULATOR, LP MAN HI-LO#   S.I.T. 907.206 (10.0" - 3.6")
1 x PANEL, 430 ONE PC 25 x 38*
1 x SHL, LEG - BRKSHR/GRNFD OXB   OXFORD BROWN - SCREEN MDL
1 x GSKT, BURNER TRAY - 564SS   17" x 10-7/8"
1 x FLEX PIPE, 1/2"od x12" BLK w/   1 FTNG - 9-7/8 / 11-1/8 w/FTNG
1 x CONV PARTS, LP   VARIOUS MODELS
1 x THERMO-PILE - RS#   ALL BV/DV w/ROBERT-SHAW PILOT
1 x GLASS SPACER, (1) HER FS   DV/BV 13-3/16" LONG
1 x LIGHT SOCKET, HALOGEN   616/564 HO/CYPRS/GRNFLD
1 x PILOT ASSY w/SLEEVE 430/616EG#   2-WY
1 x CONV PARTS, NG - SIT   864TRV-GS
1 x BRKT, FACE, BTM (564/864)   SET OF 2 - WILMINGTON
1 x RHEOSTAT WHEEL (1)   w/ SPACERS AND COLLAR
1 x ASHPAN PAWL - NO KNOB   ELAN/400/900 PS-PI 1991-1996
1 x GSKT (10pk), MIXING TUBE#   VARIOUS MODELS
1 x REMOTE HRNS PLUG, 3-LOOP#   VARIOUS GAS MODELS
1 x SWITCH, ROCKER - SINGLE POLE#   WHITE
1 x STEPPER MOTOR, NG GS2#   GS2/GSR/GSR2 - 3.5"-1.6" WC
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x BATTERY HOLDER, GSR-2#   PRO-FLAME-2
1 x PILOT ASSY, NG PSE 2-WY# � UNIVERSAL
1 x ORIFICE, BURNER - No. 64   SERVICE PART
1 x GSKT, FLUE ADAPTER 9" x 9"   VARIOUS MODELS
1 x PILOT SHIELD[v2] 430/616 PSE   SR# SPECIFIC
1 x LOG, FRONT LEFT - LS31#
1 x AUGER FLIGHT 2" PITCH#   AGP/FXFR/DRFLD
2 x SHL, LEG, BRKSHR/GRNFD SCN CRB   CARBON PATINA - GS2
1 x INSULATION (2-Pc.) REAR VENT 21 TRV   RV CONVERSION - ALL TRV MD
1 x SNAP-DISC - CRMIC 110deg - NO#   2012 to CURRANT - PS/PI
1 x IGNITER - 250 WATTS#   AGP/DRFLD/FXFRE
1 x LAMP SHDE ASS'Y, EDN/NORFLD   GS (24")
1 x WIRE HRNS, SPLITTER#   ON/OFF SWITCH
1 x PILOT ELECTRODE COVER TUBE   SILICONE TUBE
1 x GSKT TAPE, 1/4" X 1/16" WHT   10' BULK LENGTH
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x ANDIRON, WROUGHT IRON*   864 & CLEAN FACE
1 x SNAP-DISC BRACKET (NEW STYLE)   UNIVERSAL - GAS/PELLET
1 x RHEO w/OFF, SQUARE(MM)#   w/NUT & WASHER
2 x ORIFICE, BURNER - No. 43#   1.180" BRASS HEX (.089 dia)
1 x VALVE, NG BV, ROBERTSHW 96-00#   w/TCI BLOCK
1 x BLOWER-ASS'Y, LEFT - 864HO#   SERVICE PARTS
1 x HW PACK, REMOTE - MOD LP GS   SERVICE PART
1 x HEARTH PLATE - 864 TRV GS#   SERVICE PART
1 x STORM COLLAR
1 x AUGER BUSHING PLT, LOWER, SML#   (GEARMOTOR) 1997 & UP SM PS/PI
1 x HINGE ASS'Y, DOOR - LG/SD BLK   SOCKET & PIN
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x GSKT, INTAKE - 864   864 HH/ST/TRV
1 x HRD SS SPACERS/SHIMS (5-PK)   CHECK SERIAL NUMBER
1 x ANDIRON, ARABESQUE*   864 & CLEAN FACE
1 x BLOWER ASSY, RT DVS/DVL EG INS#   EMBER-GLO MDLS
1 x REMOTE WALL MOUNT BRACKET#   w/SCRWS GRN SMRT GS
1 x AUGER MOTOR, PUSH#   FXFR/DRFLD
1 x WIRE HRNS, BLOWER   616/430 EG
1 x LOG, LEFT TWIG (TOP) - LS31#
1 x HANDLE - EXTENSION. HI-LO, SIT   VALVE REGULATOR KNOB
1 x PILOT ASSY, NG - S.I.T. #   PRE GREENSMART
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x GRILL, 864 LOUVER BLACK*
1 x THERMO-COUPLE (10Pk) - RS#   DV 95 & UP, B-VENT 96 & UP
1 x BRKT, FACE CONNECTORS L/R#   DVS /EF II/GS/31
1 x LIGHT BULB BASE/SOCKET-2-PIN#   BULB BASE,BOTTOM, w/48" LEADS
1 x BRKT SET,TOP FACE - 864   WILMINGTON/LEGACY
1 x AIR DEFLECTOR - COMBST AIR   31 DVi INSERT
1 x REMOTE, BLK WALL-MOUNT#   ALL GS/GSR/GSR2 MODELS
1 x ROLL PIN - GLS LATCH SPRING   PACK OF 5 - 5/32" dia x 3/4"
1 x VALVE REGULATOR, LP SIT#   S.I.T. 907.204
1 x GSKT, ORIFICE KIT - NG   616/430 GSR-GSR2 INSERT
1 x LOG, FRONT RIGHT - LS70 (#10)#   (TRADITIONAL) v.2
1 x ORIFICE, BURNER - No. 37   1.180" BRASS HEX (.104 dia)
1 x GSKT, BLOCK-OFF, EXHST 21 TRV   8-1/2" x 8-1/2"
1 x ORIFICE, BURNER - No. 53 #   1.180" BRASS HEX (.0595 dia)
1 x SNAP-DISC BRACKET (NEW STYLE)   UNIVERSAL - GAS/PELLET
1 x AUGER MOTOR STOP - PUSH   VR.2 - CHK SR#
1 x FLUE COLLAR ASSY, 864   INTAKE/EXHAUST PIPE
1 x LOG SHELF (864 ST)   SERVICE PART
1 x SWITCH, ROCKER, ON/OFF#   SINGLE-POLE, VARIOUS GAS UNITS
1 x BLOWER, COMB [vr.1] FXFRE/DRFLD# � FOXFIRE/DEERFIELD
1 x SPACER, 1/4 dia. x .312 - BLK   4 PACK - VARIOUS UNITS
1 x FLEX PIPE, 3/8 x 8-1/2#   w/ ORIFICE MANIFOLD
1 x ENAMEL TOUCH-UP - OXFORD BRN#   15 ml BOTTLE
1 x INJECTOR, PILOT - NG (#62)#   USE w/SIT PILOT ONLY
1 x STEPPER MOTOR, NG GS2 4-PK#   1.6"-3.5" WC
1 x LOG EMBERS, LARGE BAG #   12oz. BAG
1 x TOOL, GLASS LATCH/RESTRICT0R #   VARIOUS GAS AND PELLET
1 x SCREEN, FRONT, CONVT AIR   CYPRESS
1 x SHUT-OFF VALVE#   VARIOUS GAS UNITS
1 x PIPE ADAPTER-3/8FLRx1/2NPT   BRS 45deg FLRD(FEML PIPE THRD)
1 x PILOT ORIFICE, LP - 0.014 PSE#   PSE PILOT ASSY
1 x HINGE ASS'Y COMPLT, L/R   21DV/TRV/LG/SD
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
1 x BRKT SET, ANDIRON   864HO - FRNT/BACK
1 x MANUAL, FOXFIRE PELLET STOVE   2015
1 x SCREEN FRAME ASSY, 564#   SS/DF/DLX/HO/CF2
1 x SCREEN, CLEARFIRE, SIDE - CYP/GRNFLD   16.125 x 11.025
1 x SHL, SIDE LT, GRNFLD SCR   CARBON PATINA
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x CONV PARTS, LP - SIT #   ALL/BERK/CDR/PRA/TOL/DVSZC-INS
1 x PILOT HOOD, 3-WAY SIT #   NON-GREENSMART
1 x PAINT, METALLIC BLACK 3oz#   SPRAY CAN
1 x AIR DEFLECTOR, NG - 864HO-EF   864HO-EF w/ LODGE PINE LOGSET
1 x WIRE HRNS, POWER GSR2#   INCOMING POWER
1 x KNOB, RHEOSTAT, PHD - WHITE   SERVICE PART
1 x SHL, LEG, BRKSHR/GRNFD NWI   NEW IRON, - SCREEN MODELS
1 x CONV PARTS, LP 864HO EF SCR   EMBERFYRE - GSR2 SCR MDL
1 x ORIFICE, BURNER - .0625"   1.180" BRASS HEX (.0625 dia)
1 x Steel Brick Kit
1 x BLOWER CONV, RIGHT#   FOXFIRE ONLY
1 x GLASS w/GASKET - 564SS   NO FRAME
1 x SNAP-DISC - 230deg NC#
1 x CONTROL PANL, 864/564 AUST   564HO/SS, 864 ST
1 x SHL, TOP, GREENFLD NI GS2   SCREEN MODEL
1 x STUD PLATE - SIDE GLASS CLIP   SPDV/SPTBAY
1 x LOG, RIGHT - LS70 (#4)#   (TRADITIONAL) v.2
1 x STONE SET, FYRE-STONES A*   FOR 564 HO
1 x THERMO-PILE (10-PK) - RS#   ALL BV/DV/ w/ ROBERT SHAW PILOT
1 x GSKT, OVERHEAD LIGHT   2 PACK, 2.86 x 2.86
1 x PATINA FINISH PROTECTANT
1 x GRILL, 564 LOUVER BLACK*
1 x FLEX PIPE, 3/8"od x8" BLK   NO-FITTINGS
1 x GSKT, GLASS -TADPOLE [50ft] BLK   50' BULK LENGTH
1 x PUSH PLUG, 1/4" dia, BLK   FWI/FXFRE
1 x FACE HOOKS RT/LT (WLM - 21)   1-SET
1 x SHL, SIDE RT, GREENFLD Scr OXB   OXFORD BROWN w/SCREEN
1 x GSKT, GLS 15/16x100" 302-B#   VARIOUS WOOD, PELLET & GAS
1 x SHL, FRONT, GRNFLD BRNZ PAT   BRONZE PATINA SCR MDL
1 x FLEX PIPE, 3/8"od x 28" BLACK   NO-FITTINGS
1 x PAINT, METALLIC BLACK - 12oz.#   SPRAY CAN
1 x REAR PANEL, FIREBOX CYPRESS
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x FIRESTOP ASS'Y   3615,4415,4415ST,6015 HO & 564 SS
1 x BLOWER ASSY, LF DVS/DVL EG INS#   EMBER-GLO MDLS
1 x FLEX PIPE, 3/8"od x 12 BLK   NO FITTINGS
1 x LOG, EMBER CHNK #9, FRNT LS63#   DRIFTWOOD
1 x MOTOR STOP KIT   UNIVERSAL
1 x GLASS, 1/4 CRUSHED BRNZ 10LBS*
1 x SCREEN, CLEARFIRE - 564SS   31.874 x 18.625
1 x FRBK MEDIA TRAY REAR 564 DF   PAINTED BLACK
1 x ORIFICE, BURNER - No. 55   1.180" BRASS HEX (.052 dia)
1 x SHL, SIDE, RT GRN NWI SCN   NEW IRON - SCREEN MODEL
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x PANEL, CUSTOM 616 4 PACK*   47.5 x 46.5 x 8, UNPAINTED
1 x GLASS LATCH - FINGER-PULL#   vr.2, 2007+
1 x THERMO-COUPLE - SIT #   USE w/SIT PILOT ONLY
1 x GSKT, FLUE COLLAR   VARIOUS MODELS
1 x VALVE REGULATOR, NG SIT#   S.I.T. 907.201 (1.6 - 3.5)
1 x WIRE, HI-TEMP 18ga 10FT.   ACCENT LIGHT ASS'Y 600v/450c
1 x GRILL ASS'Y, TOP - 864   TRV/HH/ST
1 x SHL,TOP INS, GRNFLD - OXFD   TOP INSERT PLATE - REAR VENT
1 x PANEL, 616 ONE PC 30.5 x 42*
1 x LOG EMBERS, SMALL BAG #   4 oz. bag
1 x LOG, RIGHT TWIG - LS38 (#4)#
1 x LIGHT BULB, HALOGEN 5PK#   35watt, T4, 120volts, 380 Lumen
1 x GLASS w/GASKET - 21DV   21/HDY/SWD
1 x BURNER ASS'Y, INNER - 864 ST   GS/GS2
1 x FLUE ADAPTER, DV 8" TO 6-5/8"*   810004994
1 x RHEO w/OFF, 90v, RECT (MM)#   w/NUT & WASHER
1 x BRKT, BLOWER MOUNT RAD 2   INCLUDES FASTENERS AND GROMMETS
1 x PILOT ORIFICE, NG - 0.020 PSE#   NG PILOT ORIFICE
1 x STEPPER MOTOR, NG GS2#   GS2/GSR/GSR2 - 3.5"-1.6" WC
1 x FIREBACK, LG FS TOP ENAM BLK*   CYPRESS / GREENFIELD
1 x PIPE ADAPTER, 3/8 FLARE x3/8M   3/8 FLARE x 3/8 MPT - 1/4 FPT
1 x GLASS w/GASKET - HER BAY SIDE#   (B/DV/DVL)LIMITED AVAILABILITY
1 x TRIM, BOTTOM FRONT - 864   BARRIER SCREEN MODELS
1 x EXHAUST RESTRICTOR   EDEN/NRTHFLD/GRNFLD
1 x COVER PLATE w/FASTENERS   UNIVERSAL
1 x VALVE, TCI BLOCK #   B-VENT GAS COMPONENT
1 x POWER CORD, w/MOLEX (18 GA) #   UNIVERSAL - WOOD & GAS
1 x AC ADAPTER, 7v #   BASE GRN SMT APPLIANCES ONLY
1 x FUSE, 3.15AMP 5-PK GS2#   GS2 CONTROL BOARD
1 x LOG, LEFT TWIG (BOTTOM) -LS31#
1 x GLASS, 1/4 CRUSHED PLAT 10LBS*
1 x BOARD MOUNTING BRACKET   864 HH/ST
1 x BLOWER, CONV, DVL FS '98 & UP#   SALISH/HERITAGE 1998-2009
1 x EMBERS, ROCK-WOOL 5 gram#
1 x BLOWER, LT, GAS INS - 2005+ #   EF-II/DVS/DVL/31/33
1 x ANDIRON, ARABESQUE*   864 & CLEAN FACE
1 x SHUT-OFF VALVE, GAS#   1/2 INLT, 3/8 FLARE TUBE OUTLT
1 x BRKT SET, FIREBOX - 864   WILMINGTON/LEGACY
1 x VALVE, NG BV, ROBERTSHW 96-00#   w/TCI BLOCK
1 x VALVE, NG - S.I.T. (3.5-1.6)#   S.I.T. 820.704
1 x BRKT SET,TOP FACE - 864   WILMINGTON/LEGACY
1 x AUGER MOTOR, METERING#   FXFR/DRFLD
1 x LOG, FRONT LEFT - LS70 (#9)#   (TRADITIONAL) v.2
1 x MANIFOLD COVER PLATE, NG   33i/DVLGSR/864HO/GRNFLD/CYPRS
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x BURNER, RMA RETURN REQUIRED   PAN ONLY - 1995-97
1 x MANUAL, NORTHFIELD GS2 2013
1 x WIRE HRNS, SPLITTER#   ON/OFF SWITCH
1 x ACCESS DOOR BRKT, RIGHT   31/33/DVSGS/DVLGS
1 x KIBBLE SHELF, 2-PK   NORTHFIELD/EDEN - GS2
1 x BRICK RETAINER (2) w/SCW#   UNIVERSAL PART
1 x BRKT, PILOT ASSY 430/616EG
1 x STEPPER MOTOR, LP GS#   GS1/GSR/GSR2 - 11"-2.9" WC.
1 x SHL, SIDE RT, GRNFLD SCR   CARBON PATINA
1 x HANDLE, DOOR - BLK PHENOLIC#   VARIOUS MODELS
1 x LOG, EMBER CHNK #11, RGT LS63#   DRIFTWOOD
1 x HEAT SHIELD BLOCK OFF 564SS   SERVICE PART
1 x LOG, FRONT (CHUNK) - LS13#   36DVXL EF/EF2/HERT EF2/864HH
1 x ORIFICE, PILOT LP - .016 #   ROBERT SHAW
1 x WIRE HRNS, JUMPER, BLWR/PILOT   VARIOUS GSR2 MODELS
1 x BURNER SKIRT KIT, 864HO EF   96900144 - EF BURNER KIT
1 x FLUE ADAPTER, DV 8" TO 6-5/8"*   810004994
1 x LOG, RT END(LG CHUNK) LS31#
1 x SHL, TOP INSERT PLATE   GREENFIELD NEW IRON
1 x LOG, REAR - LS60 (#1)#   430 TRADITIONAL
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x BURNPOT HOLDER   FOXFIRE
1 x CONV PARTS, NG - SIT   31DVi INSERT
1 x HRD ASSEMBLY REPAIR KIT   CHECK SERIAL NUMBER
1 x PILOT ORIFICE, NG - 0.018 PSE#   NG PILOT ORIFICE
1 x PORCELAIN TOUCH UP PAINT - BLUE MAJOLICA
1 x BURNER ASSY, FRONT#   VARIOUS MODELS
1 x DAMPER BLOCK OFF COVER (1)   w/ FASTENERS
1 x CNTRL PANL-ASS'Y, 31/33 DVi   GS - SERVICE PART
1 x WIRE HRNS, REMOTE GSR-2#   PRO-FLAME 2 - 20"
1 x GSKT, PILOT ASSY, GS#   ALL GREENSMART UNITS
1 x RESTRICTOR, INTAKE - 564   GS2/GSR2 - SS-DF-DLX
1 x FACE, 34 PROFILE BLACK SCR EG*   FOR DVL EMBER-GLO ONLY
1 x BURNER, REAR - 31 DVi   31 DVi/DVS DF - GSR & GSR2
1 x BLOWER BRKT ASS'Y, LEFT   BERK/PRA/CDR/ALEG/TOL
1 x FASTENER - SCW 25 PK   HWSHSMS,#8 x 3/8" TYPE B
1 x FUSE, 3AMP, 1/4 dia 5-PK#   250-AVC, GLASS TUBE, 3AG
1 x FASTENER - KEPS NUT, 10 PK   8-32
1 x FRBK MEDIA TRAY FRNT 564 DF   BLACK PAINTED - SERVICE PARTS
1 x EMBERS, ROCK-WOOL 5 gram#
1 x VALVE, LP BV, '96-00 - DEXEN   w/TCI BLOCK
1 x BRKT,CMPLT KIT , DVS BK PLT   BK PLT-DVS/EF/GS/31
1 x LOG, RIGHT TWIG - LS45 (#6) #
1 x FUSE, 3AMP, 1/4 dia 5-PK#   250-AVC, GLASS TUBE, 3AG
1 x LOG, FRONT LEFT LS63(#7)#   DRIFTWOOD
1 x RIVET - BURNER PLUG, 5-PK   VARIOUS GAS
1 x PILOT TUBE, SIT#   USE w/SIT PILOT ASSY ONLY
1 x GSKT, BLOCK-OFF, INTAKE 21TRV   8-1/2" x 8-1/2"
1 x THERMO-PILE (10Pk) - SIT#   SIT PILOT 1999-2009
1 x FRONT PLATE, GS - CNTRL PANEL   TOL, EDN, BRKSHRE, NRTHFLD
1 x LOG, LEFT TWIG - LS45 (#5)#
1 x EMBERS, ROCK-WOOL 50 grams#   8X10 BAG
1 x EMBERS, ROCK-WOOL 5 gram#
1 x FAN KIT, DVS-EF 2000 #   BRK/ALEG/PRA/CDR/TOL
1 x ASH CLEANOUT COVER(1)   FOXFIRE/AGP INS 5.500 X 3.499
1 x FUSE, 3AMP, 1/4 dia 5-PK#   250-AVC, GLASS TUBE, 3AG
1 x SWITCH, SNAP ACTION, MINIATURE   VARIOUS MODELS
1 x BURNPOT SCRAPER TOOL#   AGP/FXFR/DRFLD
1 x VALVE TRAY ASS'Y - 1080CF   SERVICE PART
1 x Log, Right Dfx24c Servic
1 x TRIM, FACE ASS'Y, 1080/36 CF-R   2008'
1 x WIRE HRNS PIG-TAIL, MALE   3-PIN, JNCTN BOX
1 x Ass'y, Screen Frame, Pain
1 x WALL PLATE, WHITE (RKR SWTCH)   SERVICE PART
1 x Snap Disk Bracket Form
1 x PANEL, DVL II 4 x 6*
1 x PILOT ORIFICE, NG - 0.020 PSE#   NG PILOT ORIFICE
1 x STOVE PACK, RADIANT, LARGE   SERVICE PART
1 x PILOT ELECTRODE - SIT#   SPARK ELECTRODE - SIT PILOT
1 x PILOT ASSY, NG PSE 3-WY #   CYP/33/DVL/864HO - GSR2
1 x PILOT TUBE, 24" - PSE#   2 & 3-WAY PILOT ASS'Y
1 x PILOT ELECTRODE - SIT#   SENSING ELECTRODE - SIT PILOT
1 x PILOT ORIFICE, NG - 0.020 PSE#   NG PILOT ORIFICE
1 x Novasit Pilot Hood 3 Way 00/01/02/03/04
$117,257.86
Shipping Charges
Share Product
Share via E-Mail Share on Facebook Share on Twitter Share on Google Buzz Share on Digg