1 x | LEVELING BOLT[4], CST/BRS LEG# 1/4-20 w/RUBBER TIPS |
1 x | Bulk50-hcs 5/16-18 X 1/2 |
1 x | Accin Comb Box Insulation |
1 x | LOG, RIGHT TWIG - LS38 (#4)# |
1 x | Bulk25-ssscp5/16-18 X 3/8 |
1 x | BACK HEAT SHIELD-TOP |
1 x | 59 : FRONT - BORDEAUX |
1 x | HANDLE (SPRING), A/C - BLACK# 3/8" id x 2.500" LONG |
1 x | GLASS RETAINER ASSY, 3n1 SML# w/GLASS & GASKET |
1 x | Flex Line-30 |
1 x | FASTENER - SCW 6 PK THREAD CUTTING - 10-24 x 1/2" |
2 x | BURNER ASSY, DANCING FYRE# 33 DVi/CYPRESS/DVL GSR/GSR2 |
3 x | Snap Disc Control (blower |
1 x | Hearth Brick Sc42 Servic |
1 x | HANDLE w/BRS CAM, BLK HDL# BLACK SPRING HANDLE, 1988+ |
1 x | Robertshaw Regulator - NG |
1 x | BURNER TUBE, 616 DF DIAMOND FYRE 2013-2017 |
1 x | Control Panel With Decal GF55 |
1 x | BAF SUPRT, FRONT - ANS 84-87 440T 1983 (AKA A6-108) |
1 x | FASTENER - SCW 6 PK THREAD CUTTING - 10-24 x 1/2" |
1 x | FIREBACK, CAST IRON LG PS/PI# BRICK PATTERN - YNK-AST BY/AST |
2 x | GSKT, ROPE [50ft] 3/8" dia. BLACK BULK - 50' |
1 x | AIR DEFLECTOR, BURNR(NG CYPRS) |
1 x | ASHPAN ASSY - LYDN/ARB COMPLETE WD/PEL |
1 x | DIFFUSER UNIVERSAL 18 GA ALZ - 3.639 x 3.232 |
1 x | Oak/tl3 Ss Brick Clip Set |
1 x | Dvgin 1-3/4 Fluplate-sale |
1 x | Side Trim Plate |
1 x | MOISTURE METER# FIREWOOD MOISTURE |
1 x | AIR CONTROL LINKAGE LEY/ARB WOOD & PELLET |
1 x | Advance Cast Brick Panel |
1 x | GSKT, DOOR 7/8" x 50' BLACK# ROPE - MISC. GAS/WOOD/PELLET |
1 x | Blower |
1 x | Track Bottom Ptd Assy |
1 x | BRASS MALE COMP FITTING |
1 x | AIRTUBE KIT, L-13 ANS/ANS-NT# #39271, PAT #5001 & 1250/CMNO |
1 x | BLOWER ASSY LT - 864/564# FAN KITS 99000156/99000162 |
1 x | GLASS CLIP SCREWS (10), AVA # 10-24 x 1/2", BRASS/CAST DOORS |
1 x | P38 Circuit Board Upgrade |
1 x | CORD RESTRAINER - LRG (BLACK) AC POWER CORD |
1 x | Accin Rghtwing-paint-sale |
1 x | Auto/Manual Fan Switch |
1 x | FASTENER - SCW 25 PK HWSHSMS,#8 x 3/8" TYPE B |
1 x | SHAKER HANDLE MOUNT-SALES |
1 x | Acc/xxv Distribution Blwr |
1 x | PUSH PLUG, 1/4" dia, BLK FWI/FXFRE |
1 x | Bracket, Brick Top Servic |
1 x | Clean Out Covers |
1 x | GLASS (POST MAY 06) |
1 x | COVER PLATE, OUTER 21TRV ALL TRV MODELS |
1 x | GLASS, SMALL LOPI# 8-7/8 x15-3/8" GSKT NOT INCLD |
1 x | FASTENER - HEX NUT 5-PACK# BRASS 3/8-16 - JAMB/TOP-LOCK |
1 x | WIRE HRNS, BLOWER, FWI # FLUSH WOOD INS |
1 x | SENSOR/A350 CONTROL |
1 x | Thermostat - Low Voltage |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | CERAMIC BRICK RETAINERS w/SCREWS - SET OF 2 |
2 x | HANDLE (SPRING), A/C - BLACK# 3/8" id x 2.500" LONG |
2 x | Firebrick Lt Side Assy |
1 x | Adv-04/xxv Push Arm-sales |
1 x | Dvgin Pilot Cvr-rear-sale |
1 x | GSKT, DOOR 7/8" x 50' BLACK# ROPE - MISC. GAS/WOOD/PELLET |
1 x | GLASS, LPI SMALL, DOUBLE# DOORS 81-86, 6.750" x 8.750" |
1 x | BRICK-CUT, 9 x 3-13/64 |
1 x | Spacer |
1 x | Dvgin Xl Label Plate-sale |
1 x | FAN, FRONT MOUNT INS WOOD II* ANSWER/REVERE/1250/1750 |
1 x | Tube Scraper Rod |
1 x | Bulk100-fhn 5/16-18 Z 5 |
1 x | AUGER DRIVE COLLAR, 1997 & UP VARIOUS MODELS |
1 x | GLASS, AVALON SMALL# 5mm NEOCERAM - 10.125 x 17.094 |
1 x | GLASS, LARGE LOPI# 5mm NEOCERAM - 9-7/8"x19-1/4" |
1 x | HNDLE KIT FL-WD w/ DR KNOBS EXT ROD, w/ KNOB AND SCREW |
1 x | BLOWER w/MTNG PLATE# 21 RV/TRV's |
1 x | BURNER ASS'Y (EF) 21 TRV SERVICE PART |
1 x | Hearth Ledge For Servic |
1 x | ACCESS DOOR BRKT, RIGHT 31/33/DVSGS/DVLGS |
1 x | # 37 burner orifice |
1 x | BLOWER, RT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | AIR DEFLECTOR, REAR (CYPRESS) |
1 x | DOOR CAM, LOPI - STAMPED STL# 1986-87 WOOD |
1 x | BLOWER, RT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | BURNER ASS'Y (EF), LP/NG# 2004 & UP DVL INSERT/ZC |
2 x | Round Ceramic Magnet (Each) |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | Ash Lip--Left |
1 x | BURNER O-RING 5-PK - #20 7/8" id x 1" od |
1 x | GSKT, 1/2" X 50' BLACK# BULK - 50' |
2 x | MOISTURE METER# FIREWOOD MOISTURE |
1 x | Grate Assy Painted |
1 x | Safety Relief Valve |
1 x | Left Side Brick Sc42 Ser |
1 x | Convection Fan |
2 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | Decorative Ash Bed / Control Cover Kit (Six Pack) |
1 x | DIFFUSER UNIVERSAL 18 GA ALZ - 3.639 x 3.232 |
1 x | Domestic Power Cord |
1 x | ROLL-PIN TOOL# SERVICE PARTS |
1 x | Right Side Brick Sc42 Se |
1 x | BURNPOT, SS - SMALL 1991-2012# PS/PI - A.K.A. FIREPOT |
1 x | Oak Rear Brick Retnr Set |
1 x | DIFFUSER, w/ SCWS VARIOUS MODELS |
1 x | ADC HINGE BIN |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | Bracket Rheostat-s M L |
1 x | Clean Out Cover Plate |
1 x | 17-1/2IN FLAPPER-SALES |
1 x | HANDLE (WOOD), DOOR# w/ SCW 1/4-20 x 1-1/4" BLK |
1 x | 1/2 Pipe Thread Drain Bin |
1 x | DOOR, AVA, MED BLK, SML HINGE NO GLASS w/HANDLE (PEN/RAI) |
1 x | Scroll Three-Fold Screen |
1 x | Ash Lip--Center |
1 x | BRICK-CUT, 9 x 1-3/8# |
2 x | Advance Bright Nickel Doo |
1 x | (83529) Auger Pin 1 |
1 x | MANTEL SHIELD* |
1 x | 1B : PIEZO IGNITION MODULE |
2 x | Vermiculite; Bag |
1 x | M55C-FS & FPI/MILAN/EMPRESS FPI 4 AMP SMALL FUSE IGNITOR |
1 x | 1/4" Silicone Tubing (15") |
2 x | Advance Bright Nickel Gri |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | BRICK-CUT, 9 x 2-7/8" # |
1 x | RHEO w/OFF, 90v, RECT (MM)# w/NUT & WASHER |
1 x | RHEO w/OFF, 90v, RECT (MM)# w/NUT & WASHER |
1 x | HW PACK, PANEL - MOUNTING HW# SCREWS & NUTS - UNIVERSAL |
1 x | ANDIRON, WROUGHT IRON* 864 & CLEAN FACE |
1 x | AUTO DRAFT CONTROL-SALES |
2 x | Fan Speed Controller Knob 99/00/01/02/03/04 |
1 x | CNTRL MODULE, REMOTE FUNCTN# GSR2 MODELS |
1 x | HANDLE (WOOD), DOOR# w/ SCW 1/4-20 x 1-1/4" BLK |
1 x | Dvgin 2in Flue Plate-sale |
1 x | AUGER BUSHING PLT-UPR, LYD/ARB SERVICE PART |
1 x | CONV PARTS, LP - 564 SS SIT 564SS GS1 ONLY |
1 x | SET OF CUT BRICK FOR 3500 |
1 x | Tl/dvc/win Glass Clip-4 |
1 x | 22 : WIRE HARNESS FEMALE-MILLIVOLT CONTROL |
1 x | 3/16 Rubber Spacer-10pack |
2 x | Set Of 7 Standard Bricks |
1 x | HANDLE (WOOD), DOOR - AVALON# 1/2" id x 4.169" LONG |
1 x | CONV PARTS, NG - SIT/PSE 33 DVi |
1 x | Burner Tube NG/LP 99/00/01/02/03/04 |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | GLASS RETAINER w/GSKT, 3n1 LRG DOOR GASKET ONLY, NO GLASS |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | Dvgin Flue Access Cvr-sal |
1 x | Faceplate Mounting Brackets Top - Oversize (Each) *** |
1 x | Drive Chain |
1 x | Manifold Pri Air-cdwl |
1 x | BRICK-CUT, 7"x 4-1/2" (#63) |
1 x | Digital Control Board |
1 x | GSKT, IGNITER MOUNT 42 APEX |
1 x | BURNER BRKT SET L/R UPGRADE SNAP DISC PERFORMANCE |
1 x | LEVELING BOLT COVER, WD INSERT VARIOUS INSERTS - 2-PK |
1 x | Cover Hopper GFI55 |
1 x | BURNER FLR EMBER LT/RT - B52# 1 (SET) DVL INSERT 2009 (GS) |
1 x | GSKT, ROPE, DR 7/8" x 64" BLACK# VARIOUS WOOD/PEL/GAS |
1 x | CNTRL MODULE, REMOTE FUNCTN# GSR2 MODELS |
1 x | CONV PARTS, LP - SIT # ALL/BERK/CDR/PRA/TOL/DVSZC-INS |
1 x | Southern Comfort 24", VF Logs, Concrete 1/2 |
1 x | Combustion Fan Housing Gasket (motor to housing) |
1 x | KNOB (WOOD) w/ SCREW, BLK FWI# 3/8 i.d. w/HOLE - PAINTED BLK |
1 x | GSKT, GLASS 3/4" WIDE x 70"# LOPI WOOD, PELLET & GAS |
1 x | DRAFT FLOW TUBE, 26" # ALL PELLET FS & INSERTS |
1 x | SCREW-HWH TCS 10-24 X 3/4 |
1 x | FIREBOX, CORNER WELD COVERS# LIB/OLY/FREEBY |
1 x | DAMPER PLATE, NX GEN FW MED. MED. FLUSH WOOD |
1 x | BLOWER, COMB, PELLET - LARGE# 2000 & UP, YANK/AST |
1 x | DOOR HANDLE ASS'Y, '84 DBL DR# NON-CAM SIDE |
2 x | Pc45 Frnt Plate Lck-5 Pk |
1 x | BLOWER POWER CORD, w/RHEOSTAT# UNI REAR/LPI FRT, NO FL/FR BAY |
2 x | AIR CONTROL SHUTTER, REAR CYP,GRNFLD,864HO, 33DVi,DVLGSR |
1 x | KNOB (PHENOLIC), 3/4" dia 1/4-20 THREAD - BALL SHAPED |
1 x | Brkt-brick Support |
1 x | BLOWER STUD PLATE (2) 21 TRV |
1 x | DIFFUSER, w/ SCWS VARIOUS MODELS |
1 x | Well Wel11a-601r |
1 x | Form Louver Door 400bdv W |
1 x | Glass Retainer |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | 12 X 6 Tile Frame-brsh Ss |
1 x | Handle Mount Plate |
1 x | GLASS CLIP (4), AVA # VARIOUS MODELS WD/GS/PEL |
1 x | Door Control Panel W/Hinge GF55/GFI55 |
1 x | Adv-right Burn Pot Prot-s |
1 x | GSKT, ROPE, DR 7/8" x 64" BLACK# VARIOUS WOOD/PEL/GAS |
3 x | Novasit Pilot orifice |
1 x | Proof of Fire Switch |
1 x | FASTENER - HEX NUT 5-PACK# BRASS 3/8-16 - JAMB/TOP-LOCK |
1 x | Firebox Baffle |
1 x | Tadpole Rope Adv Cut-sale |
1 x | 2" Clearance Firestop Spacer (1 ea.) |
1 x | BRUSH, BOTTLE STYLE# UNIVERSAL PS/PI |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | Remote, Wireless Wall Mount, On/Off, Hi/Low, Electronic |
1 x | DOOR CAM,LOPI - BRASS# 88 &UP WOOD, 1990-96 PEL |
1 x | FASTENER - BOLT 5 PK HHCS 1/4-20 x 1/2" |
1 x | CONCEALMENT COVER, 564 GS SERVICE PARTS |
1 x | NG to LP Gas Conversion Kit |
2 x | Anti-Draft Shield for Round Top Only |
1 x | SF160 JACKET TOP-SALES |
1 x | CONV PARTS, NG - SIT# 864 TRV |
1 x | Ember Blaze Top Log 18 |
1 x | GLASS RETAINER ASSY, 3n1 LRG# w/ GLASS, GASKET & CLIPS |
1 x | KNOB (WOOD), SIDE A/C 5/16 id AIR CONTROL (ASH/ALDER) |
1 x | ACCESS DOOR BRKT, RIGHT 31/33/DVSGS/DVLGS |
1 x | Glass Clip |
1 x | BURNER ASSY, REAR - 564 SS# 2007-2019 |
1 x | Form Canopy 36 Mag/lo Ri |
1 x | BRKT HINGE ASSY, BTM 564/864 SET OF 2 - SEA/WIN VIC LACE |
1 x | POWER SUPPLY Y350R-1C |
1 x | EMPRESS FPI WIRING HARNESS |
1 x | 8-1/2X14-15/16 RECT GLASS |
1 x | 38/45/61/68 Fdr Cover-sal |
1 x | ROLL-PIN TOOL# SERVICE PARTS |
2 x | 9B : PILOT LP |
1 x | HANDLE, DOOR 42 APEX |
2 x | T-stat Sensor W Wire Asse |
1 x | Louver Form 28.275 Vmi |
1 x | BYPASS TOOL, 42 APEX |
1 x | N/S : AIRTUBE FLANGE PLATE |
1 x | N/S : 1/4 FLAT WASHER (4 USED) |
1 x | 3500 JCKT SIDE W/O HOLE-S |
1 x | LEG REPAIR KIT - EVER/END/LIB# LOPI 2020 |
1 x | 24" GALVA TEMP LENGTH |
1 x | N/S : RHEOSTAT |
1 x | N/S : OUTSIDE AIR BOX COVER |
1 x | GSKT, 1/2" X 50' BLACK# BULK - 50' |
1 x | HW PACK, IGNITER F/S vr.3 94400955 |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | 8 : CS, HEX HD 1/4-20 X 1/2ININ GR5-BLK |
1 x | PULL RING, METALLIC BLACK # PAINTED |
1 x | SIDE SHEILD, RT - LIB NEXGEN RIGHT SIDE |
1 x | LEVELING BOLT[4], STEEL/PWR LEG# w/RUBBER TIP - 3/8-16x1.5" |
1 x | N/S : PILOT SHIELD KIT-MILLIVOLT CONTROL |
1 x | Wood Knob & Bolt-2sets |
1 x | GSKT, DOOR 7/8" x 50' BLACK# ROPE - MISC. GAS/WOOD/PELLET |
1 x | N/S : ROCKWOOL |
1 x | Injector #55 (ref 37d0340 |
1 x | GSKT, GLASS 3/4" WIDE x 70"# LOPI WOOD, PELLET & GAS |
1 x | N/S : LAVA ROCK |
1 x | GRATE ANGLE-CAST |
1 x | DOOR HANDLE ASSY, LFW-FWP v.2 SR# SENSATIVE |
1 x | N/S : IGNITION MODULE-ELECTRONIC IGNITION. |
1 x | Glass Gasket - Flush Tadpole Type (Per Foot) |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | FACE, FL WD MED TIMES SQUARE* |
1 x | AIRTUBE, ROLL PINS, PK OF 6# 1/4" dia. x 5/8"PLAIN STEEL |
1 x | DAMPER, SLDR, ENDEAVOR# 5" SQUARE w/2 SOCKETS |
1 x | FLUE ADAPTER, WD ADJ OFFSET* |
2 x | FASTENER - SCW 25 PK HWSHMS,10-24x1/2 BLK - TYPE F |
1 x | BAF SUPRT, REAR "T" # � END/REV/ 380-NT/X-NT/1750 |
1 x | DAMPER YOKE ASS'Y# UNIVERSAL |
2 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | 18.5 X 28.9 RECT GLASS |
1 x | AIR CONTROL ASSY, 1750/END/ 380-NT |
2 x | Novasit Pilot Assembly - NG |
1 x | FASTENER - SCWS 8-PK GLS CLIP# 8-32 x 3/8" PH TORX TYPE F |
1 x | 20 : FLUE COVER - VERMONT CLASSIC GREEN |
1 x | 2 : RIGHT SIDE - FOREST GREEN |
1 x | 23 : DOOR - FOREST GREEN |
1 x | 2 : RIGHT SIDE - VERMONT GREEN |
1 x | 23 : DOOR - CLASSIC |
1 x | 22 : FRONT - VERMONT CLASSIC GREEN |
1 x | 12 : BACK |
1 x | 1 : TOP - BORDEAUX |
1 x | 18 : GRATE, WOOD |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | BLOWER ASS'Y, RIGHT - FW# FW/FWP/LFW INSERTS |
1 x | SS Burn Pot Liner |
1 x | DVGIN LEFT FACE-SALES |
1 x | STRAIGHT HOT WATER COIL |
1 x | GLASS w/GASKET - CEDAR FRONT# 11.500" x 11.500" |
1 x | GRILL, HEAT-DUCT KIT w/MOUNT SCREWS |
1 x | OUTSIDE AIR KIT, WS/CAST PS* |
1 x | Combustion fan housinggasket (motor to housing) |
1 x | SNAP DISC BRACKET LG PS/PI AST/YAK (PI & PS), ARB/LEY |
1 x | MIXING TUBE, 2000-08 BRK/TOL/PRA/CDR/35CB |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | DOOR, HINGE PINS, BLACK# 2-PK, FS/INS |
1 x | DOOR SWITCH, FPX WOOD# BLWR CUT-OFF |
1 x | Valve Assembly Gasket |
1 x | THERMO-COUPLE (10Pk) - SIT# USE w/SIT PILOT ONLY |
1 x | Bottom Inner-cdwl |
1 x | SPACER, 1/4 dia. x .312 - BLK PACK OF 15 |
1 x | MANUAL, CEDAR DVS FS - 2000 |
1 x | Spring Lid/door-bbq/rvf |
1 x | Auger Stop Bracket 1 |
2 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | FACE SCREW, BLACK NICKEL PHP 1"-1/4-20, BLK NKL - 4 PK |
2 x | GSKT, GLS 15/16x100" 302-B# VARIOUS WOOD, PELLET & GAS |
1 x | HB38 30IN SCROLL DOOR |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | MANUAL, FL/LX/X 1984 |
1 x | Outer Back Asy-enc Fb |
1 x | Insert Lifter-bni |
1 x | GLASS w/FRAME - 864 TRV vr.1 KEY LATCH - SR# up to 12394 |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | Outside Air Kit (4’’ I.D. x 10 ft. long insulated flex) |
1 x | BLOWER BRKT, RIGHT T.O.L/BERK |
1 x | CONV PARTS, NG - SIT# ALL/BERK/CDR/PRA/TOL/DVSZC-INS |
1 x | AIR CONTROL ASSY, COT/MIS BRN COMPLETE ASSEMBLY |
1 x | BURNER FLOOR EMBER LFT/RHT# 1 (SET) DVS I (GS) |
3 x | 8 : CABLE CLIPS (TWO PER FIREPLACE) |
1 x | FLEX PIPE, 3/8"od x 24" BLK 22-1/2" - 24" LONG w/FITTINGS |
1 x | 13b : VALVE SIT 630.562 MP |
1 x | Refractory Brick Bracket |
1 x | BATTERY TRAY, COATED ("9v") BRK/EDN/NOR/TOL/GRN/CYP/ GS |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | HB38 STOVE BLOWER ASY-SAL |
2 x | 7 : VALVE REGULATOR LP |
1 x | RETROFIT, SIDE SHIELD(2) 1750 REPUBLIC/SPOKANE |
2 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | REMOTE, BLK WALL-MOUNT# ALL GS/GSR/GSR2 MODELS |
1 x | DRYWALL FLANGE, 21E # ELECTRIC FP |
1 x | Decorative Volcanic Stone |
1 x | Thermostat Extension |
1 x | Brkt Pilot For Service |
1 x | IGNITER COVER PLATE, FS WOOD HEAT SHEILD |
1 x | FASTENER - SCW 25 PK HWH SWAG, 10-24 x 3/8" |
2 x | 1 : PIEZO IGNITOR |
1 x | 3 POSITION ROCKER SWITCH |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | Ul Pellet Feeder Auger |
1 x | BRKT, ANDIRON - 1080 SET OF 2 |
2 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | AIRTUBE KIT, L-2 1988# REPLACES WELDED TUBES |
1 x | Esp Probe-red/red |
1 x | BRICK-WHOLE,9 x 4-1/2 x 1-1/4# STANDARD FIREBRICK |
1 x | CABLE CLAMP, ROMEX POWER CORD CLAMP |
1 x | BAF SUPRT, REAR "T" - FLEX-95 1989 - 1993 |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | Caution Label-15 X 3 Blk |
1 x | N/S : TOP/BOTTOM INSULATION SC36 |
1 x | HW PACK, PANEL - MOUNTING HW# SCREWS & NUTS - UNIVERSAL |
1 x | ENAMEL TOUCH-UP - OXFORD BRN# 15 ml BOTTLE |
1 x | BRICK-CUT, 9 x 3-1/2 (#53) |
1 x | Roof Flashing 0 to 6/12 Pitch (30" Base) |
1 x | BEARING 3/8 ID X 1-1/8 OD |
1 x | 5 : FLUE COLLAR (8IN) - EBONY |
1 x | 12 X 6 Tile Frame-gold |
1 x | BLOWER BRKT ASS'Y, LEFT BERK/PRA/CDR/ALEG/TOL |
1 x | BURNER ASSY, FRONT 564SS# 2007-2019 |
1 x | AIR DEFLECTOR, NG - 864HO |
1 x | FLAME MOTOR, 564/21 ELEC# SERVICE PARTS |
1 x | STOVE PACK, DVL (GSR) INS '09 SERVICE PART |
1 x | STEPPER MOTOR, NG GS2 4-PK# 1.6"-3.5" WC |
1 x | 3/8x1/2 Silicone Psa-20ft |
1 x | PILOT ELECTRODE COVER TUBE SILICONE TUBE |
1 x | 4 : LEFT DOOR ASSEMBLY COMPLETE |
1 x | BLOWER ASSY RT - 864/564# FAN KITS 99000156/99000162 |
1 x | Bulk100-hcs 5/16-18 X 3/4 |
1 x | DOOR LATCH TOOL |
1 x | MIXING TUBE SEAL PLATE RADIANT |
1 x | BRKT, CONTROL VALVE BERK/TOL/PRA |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | CNTRL MODULE, BASIC FUNCTION# GSB2 MODELS |
1 x | HW PACK, BOLTS - FLUSH INSERT |
1 x | N/S : MAGNET |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | Hi-Temp Round Top with Louvered Screen |
1 x | Chain-60 Pin |
1 x | ANCHOR PLATE W/ DAMPER |
1 x | GSKT, AIR CNTRL - END/1750/REV SERVICE PART |
1 x | CONV PARTS, NG - SIT 864 HO-GS/HO-NB |
2 x | N/S : SCREEN PULLS |
1 x | ACCENT LIGHT ASSY v.2 GAS INS# DVS/DVL NO GSR2 |
1 x | HW PACK, BLWR - REAR WOOD STOVE-2 |
1 x | GSKT, DOOR - 1/2" Dia, 70"# |
1 x | BLOWER, EDN/NOR# FAN KIT 99000142 |
1 x | ADC MOTOR MOUNT-SALES KB |
1 x | Bulk-pnd In Stud 8-32x3/4 |
1 x | # 30 burner orifice |
1 x | BLOWER, RT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | # 33 burner orifice |
1 x | BURNER EF CAST BTM - LP/NG BERK/PRA - 2005-07 |
1 x | BURNER ASS'Y, EF - 864HO# EMBERFYRE - NG - GS MDLS |
1 x | HW PACK, DOOR - LOPI 3-n-1 BLACK/BRASS/PEWTER - #405 |
1 x | Fan Side Facia Left Metallic Black |
1 x | WIRE HRNS, MAIN BK/GN/NR MV |
1 x | PUSH PLUG, 1/4" dia, BLK FWI/FXFRE |
1 x | Weldment, Face Servic |
1 x | PRES RELIEF DOOR (1) 96-08' DVSZC & VARIOUS FS GAS |
1 x | HB38 LEFT FRONT LOG |
1 x | HB38 REARVENT NG CONVERSI |
1 x | Feed Bushing - 2 Piece set |
1 x | CNTRL MODULE, 36CF/1080CF# VER.1- non-ALPHA MODULE |
2 x | AIR CNTL ROD EXTENSION INT/EXT THREAD - 4.438 x 3/8 |
1 x | KNOB (WOOD) w/ SCREW# A/C - ASH/ALDER |
1 x | AUGER BUSHING PLATE, UPPER # 1997 & UP PS/PI, LRG OR SML |
1 x | GLASS - SPOKANE# (1250/1750) 15.397 x 9.215 |
1 x | BRKT, FACE CONNECTORS L/R# DVS /EF II/GS/31 |
1 x | 5/8" Grommet--Cut |
1 x | 24" ULTRA TEMP LENGTH |
1 x | CNTRL MODULE, BRNR - GS1# ALL GS1 MODELS |
1 x | GSKT (x4), BLWR MNT 42 APEX - RED SILICONE STRIPS |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | REMOTE RECEIVER, GS - SIT# TIMED FAN FUNCTION |
1 x | BURNER, DVS EMBRFYRE W/LOG II* |
1 x | Tool Assembly |
1 x | CONTROL PANELw/ FUSE HOLDER 2-FUSE HOLDERS |
1 x | Caution&danger Label-10ea |
1 x | Embers - Bag |
1 x | MOISTURE METER# FIREWOOD MOISTURE |
1 x | FASTENER - SCW BLACK 6 PK PHPSMS, #8 x 3/8" |
1 x | HW PACK, LEG MNT BOLT SET OF FOUR - BOLTS & WASHERS |
2 x | 5/32" Allen key |
1 x | Coastal Legs, Brushed Nickel |
2 x | GLASS RETAINER ASSY, 3n1 SML# w/GLASS & GASKET |
1 x | BURNER PAN - REAR 430 GSR2 |
1 x | GSKT, GLS 15/16x54" 302-B# VARIOUS WOOD, PELLET & GAS |
2 x | Glowing Embers |
1 x | FASTENER - SCWS 8-PK GLS CLIP# 8-32 x 3/8" PH TORX TYPE F |
1 x | 36" GALVA TEMP LENGTH |
2 x | "B" Vent Transition Collar - 8" Chimney |
1 x | Brick Clip (Each) |
1 x | Exhaust Adapter Plate Weldment |
1 x | Vintage Red Brick Liner Kit 40 |
1 x | 9 : NAILING FLANGE |
1 x | Wall Switch Kit, On/Off, White |
1 x | 88100 Exhaust Blower Gasket 1 |
1 x | 10-2131-18 Ss Flex Hose |
1 x | 3/8 Od X 5/16 Oal-5 Pack |
1 x | 6" ULTRA TEMP LENGTH |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | BAF SUPRT, FRONT - FLEX-95 1989-93 (ANGLE) |
1 x | Fan Clip (Each) |
1 x | STOVE PACK, CAPE COD FWM 2019 |
1 x | DIFFUSER, w/ SCWS VARIOUS MODELS |
1 x | FASTENER - SCW BLK 6 PK# WD DR HNDL, 1-1/4"x1/4-20 |
1 x | 52 : 1/4-20 X 1IN STRIKER SCREW |
1 x | WIRE HRNS, GROUND - 8.25" UNIVERSAL |
1 x | CORD RESTRAINER - LRG (BLACK) AC POWER CORD |
1 x | GSKT ROPE, BLK - GLASS 3/8"x66"# AVALON WOOD, PELLET & GAS |
1 x | Round Top with Mesh Screen - Black |
1 x | Remote, On/Off, Hi/Low, Electronic |
1 x | Duplex Receptacle - White |
1 x | Bracket, Mhs Lvr,right Bd |
1 x | 3 : INNER BACK |
1 x | Advance Grill-brsh Ss |
1 x | DOOR CAM,LOPI - BRASS# 88 &UP WOOD, 1990-96 PEL |
1 x | DOOR SHELL, LARGE BLK LOPI w/ HARDWARE |
1 x | BRICK, SET OF 8, FULL SIZE* |
1 x | Piezo Kit Bracket Include |
1 x | BLOWER ASS'Y, RIGHT - 864HO# SERVICE PART |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | Pb105 Harness-press Ign |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | AIRTUBE SLEEVE, 1 x 1.250od# 1 PER PACK |
1 x | BURNER ASS'Y, 564 HO# EMBERFYRE |
1 x | N/S : DI-FACE BOLTS |
1 x | N/S : JUMP RING - WASHER USED ON HINGE PINS - FOR ENAMEL STOVES |
1 x | RHEOSTAT WHEEL - CAPE COD FWP INSERT |
1 x | FAN, REAR MOUNT F/S WOOD II* |
1 x | 2 : DAMPER BRACKET |
1 x | GLASS CLIP SCREWS (10), AVA # 10-24 x 1/2", BRASS/CAST DOORS |
1 x | 36" ULTRA TEMP LENGTH |
1 x | EMBERS & LRG NUGGETS - WP/BF/ASCOT/EG40 POST '00 |
1 x | SET-SCREWS, 3n1 DOOR KIT# SET OF (2) 1/4-20 x7/16 |
1 x | BLOWER, CONVECTION# 93-95BV,91-96PS/PI, 00 LRG PS |
1 x | FASTENER - HEX NUT# STEEL 3/8-16 -JAMB-LOCK, 5 PK |
1 x | Advance Gold Grill |
1 x | FASTENER - BOLT PACK BRICK RETAINER - CAST WOOD |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | Side Brick Bfc36 Service |
1 x | 12 X 6 Tile Frame-brt Nkl |
1 x | GSKT KIT, PILOT ASSY FOR NON-GREENSMART UNITS |
1 x | Western Timber, 30" VF Log, Concrete |
1 x | Pf/pb Control Cover-sales |
1 x | SNAP DISC HOLE COVER w/SCREWS & GSKT |
1 x | PILOT TUBE, 24" - PSE# 2 & 3-WAY PILOT ASS'Y |
1 x | Fdr -2cleanout W/gskt-2pk |
1 x | Ash Deflector |
1 x | Round Top with Louvers - Black |
1 x | DUAL BULB DOOR GASKET (10FT) LARGE EMBER NUGGETS ONLY |
1 x | GSKT TAPE, 1/4" X 1/16" WHT 10' BULK LENGTH |
1 x | Round Top with Mesh Screen |
1 x | 24 : TAVERN BROWN FIREBRICK-RIGHT SIDE |
1 x | GSKT, GLS 15/16x100" 302-B# VARIOUS WOOD, PELLET & GAS |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | Terminal Block Housing |
1 x | MOISTURE METER# FIREWOOD MOISTURE |
1 x | LIGHT BULB, HALOGEN 5PK# 35watt, T4, 120volts, 380 Lumen |
1 x | 3-n-1 DOOR SHL HW SM/LG HARDWARE ONLY |
2 x | 9B : PILOT NG |
1 x | FASTENER - HEX NUT 5-PK 1/4-20 - CENTER-LOCK |
1 x | AIR SHUTTER SLEEVE VARIOUS MODELS |
2 x | N/S : FIRESCREEN RODS |
1 x | AIR DEFLECTOR, NG - 864 HO EF EMBERFYRE BURNER - NG |
1 x | HEATER ASSEMBLY 21E# SERVICE PARTS |
1 x | TRIM PLATE SPACER |
1 x | AIR DEFLECTOR PK, STONE KIT D 616 GSR & GSR2 - 94700728 |
2 x | HANDLE w/BRS CAM, BLK HDL# BLACK SPRING HANDLE, 1988+ |
1 x | BRKT, CONTROL VALVE BERK/TOL/PRA |
1 x | AC ADAPTER, 7v # BASE GRN SMT APPLIANCES ONLY |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | TEMP METER - HANDHELD# DIGITAL READER ONLY |
1 x | LOG, FRONT RIGHT - LS39 (#3)# |
1 x | HANDLE (SPRING), A/C - BRS # 3/8" id x 2.500" LONG |
1 x | AUGER MOTOR STOP - YANK-AST LARGE PS/PI 2000 & UP |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | THERMO-PILE, 15"# MV MODELS |
1 x | ASH DUMP SEAL PLATE, w/GUIDES 1997 AND UP PEL PS/PI |
1 x | Variable Speed with Thermo Snap Switch |
1 x | CONV PARTS, NG 564 SS SIT/PSE 564 SS-GS1/GS2 ONLY |
2 x | FLEX PIPE, 3/8 x 8-1/2# w/ ORIFICE MANIFOLD |
1 x | GSKT, ROPE [50ft] 3/8" dia. BLACK BULK - 50' |
1 x | BYPASS EXT ROD, OLY/FWS/M w/ PULL RING, 5-3/4 x 3/8 |
1 x | CONV PARTS, LP 564DF GSR2 DELUXE - 2014+ |
1 x | HW PACK, LEVELING BOLTS (2) 3/8-16 x 1-1/2" |
1 x | BRKT, FACE CONNECTOR L/R - SET DVLEF-II/DVLGS/33DVi |
1 x | SPACER, 1/4 dia. x .312 - BLK PACK OF 15 |
1 x | AIRTUBE KIT, L-14 ENDVR/REVRE# (380-NT/X-NT) 1750 |
1 x | BRKT SET (L/R) SFW SMALL FLUSH WD |
1 x | #10 ID X 5/16OD X 3/8 |
1 x | A/C ADAPTER, 1080/36 CF/EXTRM# AF-4000ADP-24 / 7.5v |
1 x | REMOTE WALL MOUNT BRACKET# w/SCRWS GRN SMRT GS |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | LEG KIT, SCULPTURED STEEL* |
1 x | LOG, FRONT RIGHT - LS16 # HIDEAWAY |
1 x | ORIFICE, BURNER - No. 48 1.180" BRASS HXE (.076 dia) |
1 x | HEAT EXCHANGER SHIELD# DVS/DVL/31/33 DVi |
1 x | Cast Door Hinge With Pin |
1 x | Buff Brick Liner Kit 35 |
1 x | Valve Assembly Gasket |
1 x | HB38 RIGHT FRONT LOG |
1 x | Pilot Ods Tp Op# 8402 |
1 x | PILOT ELECTRODE - SIT# SENSING ELECTRODE - SIT PILOT |
1 x | NIPPLE, BARBED (PELLET)# |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | FASTENER - SCW, 5 PK NAME TAG #10 x 3/8 RHW BLK ZINC |
1 x | CONV PARTS, LP - PSE 564 SS/DLUX - GSR2 |
1 x | 16 : KNOB EXT ON/OFF-MILLIVOLT CONTROL |
1 x | CONV PARTS, NG - SIT# HERT/SAL/36DVXL - EF |
1 x | BURNER RETROFIT, EF, CAST,v.2# BERKSHIRE / PRAIRIE |
1 x | SET-SCREWS, 3n1 DOOR KIT# SET OF (2) 1/4-20 x7/16 |
1 x | FLEX PIPE, 3/8"od x 12 BLK NO FITTINGS |
1 x | 17 : BLOWER ASSEMBLY |
1 x | HW PACK, BOLTS - FREEDOM BAY #010 |
2 x | Blower Wire Harness 6ft |
1 x | VALVE, NG w/MAN. H/L MV+TIMER SIT 821.644 3.8-1.1 WC" |
1 x | STOVE PACK, 616 DF DIAMOND FYRE - GSR2 |
1 x | DOOR, HINGE PINS, BLACK# 2-PK, FS/INS |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | CONCEALMENT COVER, 564 GS SERVICE PARTS |
1 x | FASTENER - HEX NUT 8-32 - 25PK CENTER-LOCK - 8-32 |
1 x | 30 Degree Offset and Return |
1 x | ASHLIP TRIM, SET SCREWS - 10pk# |
1 x | HANDLE ASSY, AVA w/BRASS CAM # & WOOD HANDLE - COMPLETE |
1 x | CONTROL DOOR, MET BLACK EDEN/NORTHFIELD |
1 x | Retainer, Brick Service |
1 x | MANTEL SHIELD* |
1 x | SNAP DISC HOLE COVER w/SCREWS & GSKT |
1 x | LID CATCH-SALES |
1 x | DAMPER, YOKE ASSY, END/REV# (380NT/X-NT), 1.9" x 4.5" |
1 x | Decorative Grill--Left Side |
1 x | SNAP-DISC - 120deg NO# WOODSTOVE & INSERT |
1 x | DOOR RETAINER SCRWS(10)# 10-24 x 7/8" - 10PK |
1 x | ANDIRON, TRADITIONAL RING* 564 SS |
1 x | VENT, GAS INS 3/4 KIT J RD HW* 810001272 |
1 x | LOG, RIGHT TWIG - LS39 (#6)# |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | BAFFLE, FIREBOX - SFW 12 GA SS304 - 21 x 8-5/8 |
1 x | 7 : SCREEN WM36/WMR36/WM36A/WM36A-BRS(20IN.WX 183/8IN.H) |
1 x | GLASS w/GSKT -AVANTI, SDE 95# 1996 (SIDE) 3.799 x 10.399 |
1 x | BLOWER ACCESS PLATE 616 GSR INSERT |
1 x | ANDIRON, WROUGHT IRON* 864 & CLEAN FACE |
1 x | DOOR, AVA, LRG BLK - NO GLASS# w/HANDLE (OLY/1190/1196) |
1 x | 4a : ODS PILOT ASSEMBLY LP - MANUAL |
2 x | 9B : VALVE UV SIT 820.636 RP |
2 x | Inlet Air Collar Assy |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | MANIFOLD COVER PLATE, LP DVL GSR/33 DVi/864HO/CYP/GRN |
1 x | Square Top with Mesh |
1 x | PILOT ORIFICE, LP - 0.014 PSE# PSE PILOT ASSY |
1 x | GLASS CLIP (2), TOP/BOTTOM# DVSZC/INS 1997-2001 |
1 x | Flange,lt Side Srrnd-mnt |
1 x | BURNER ASS'Y (EF) GSR# DVS/BRK/TOL- GSR-GSR2 |
1 x | DRAW LATCH, DOOR/FLUE w/ RIVETS - VARIOUS PEL/GAS |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | Fitting Elbow 90 Degree (Located At Orifice End) |
1 x | BLOWER |
1 x | GSKT, DOOR 7/8" x 50' BLACK# ROPE - MISC. GAS/WOOD/PELLET |
1 x | LOG, RIGHT TWIG - LS38 (#4)# |
1 x | BAF SUPRT, FRONT "S" # � END/REV/380-NT/X-NT - w/DFLCTR |
1 x | EcoFlow Conversion Kit, Electronic, Propane to Natural |
1 x | KNOB (PHNLC), 1" dia x 1.64 3/8-16 THREAD - TEARDROP SHAPD |
1 x | DIFFUSER, w/ SCWS VARIOUS MODELS |
1 x | FASTENER - SCW 10 PK 3n1 DOOR# LOPI WD - HWH SWAG 10-24 x 1" |
1 x | 7 : SCREEN WM42II42/WM42II-42A/HT/SX (22IN.W X 197/16IN.H) |
1 x | BLOWER ACCESS PLATE 616 GSR INSERT |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | SET-SCREWS, 3n1 DOOR KIT# SET OF (2) 1/4-20 x7/16 |
1 x | PILOT ELECTRODE, 24" - PSE# PILOT FLAME SENSOR - PSE ONLY |
1 x | RPH MS 5/16-18 X 6 |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | N/S : DI-FACE NUT |
1 x | Injector Rear #56 Lp |
1 x | DIFFUSER, w/ SCWS VARIOUS MODELS |
1 x | SWITCH, ROCKER - 3 POS LOPI 83-93 CHK AVAILABILITY |
1 x | KNOB, PHENLIC# BLACK - 1" dia |
1 x | GLASS w/GASKET - DVS INSRT/ZC# 12-11/16" x 24-11/16" |
1 x | BURNER ASSY, REAR - 564 SS# 2007-2019 |
1 x | HANDLE (SPRING), A/C - BLACK# 3/8" id x 2.500" LONG |
1 x | GLASS w/GSKT - SPIRIT/SPT BAY# (FRONT)1996-01, 9.478 x 16.455 |
1 x | GLASS, SMALL LOPI# 8-7/8 x15-3/8" GSKT NOT INCLD |
1 x | BLOWER BRKT PLATE - BRK/TOL BRKT ONLY - NO HW |
1 x | AC PWR ADAPTER# RADIANT I |
1 x | STEPPER MOTOR, LP GS# GS1/GSR/GSR2 - 11"-2.9" WC. |
1 x | Spring Clip-20 Pack |
1 x | Grate Painted Assy Servic |
1 x | Touch up paint powder coat exterior |
1 x | BAF SUPRT, REAR "T" # � END/REV/ 380-NT/X-NT/1750 |
1 x | DOOR CAM,LOPI - BRASS# 88 &UP WOOD, 1990-96 PEL |
1 x | BURNER, 564HO DANCINGFYR TRAD* |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | BRICK-CUT, 9 x 3-13/64 |
1 x | RIVET COVER (DVL GSR/33i) 21.050 X 14.487 |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | HW PACK, REMOTE - MOD LP GS SERVICE PART |
1 x | PILOT ASSY, NG PSE 3-WY # CYP/33/DVL/864HO - GSR2 |
1 x | 15 DEGREE ELBOW KIT |
1 x | PULL RING, METALLIC BLACK # PAINTED |
1 x | 18" Section Hi-Temp Double Wall Pipe Snap Lock |
1 x | HB38 REMOTE BLOWER ASY-SA |
1 x | DOOR ASS'Y, RT - TOL MAJ BROWN CHECK AVAILABILITY |
1 x | BRICK RETAINER (2) w/SCW# UNIVERSAL PART |
1 x | GSKT, GLS 15/16"x50ft. 302-B# VARIOUS WOOD, PELLET & GAS |
1 x | BLOWER, COMB, PELLET - LARGE# 2000 & UP, YANK/AST |
1 x | BRKT SET, L/R - SFW SMALL FLUSH WOOD |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | COVER PLATE, EXHST 21TRV w/ GSKT AND SCREWS |
1 x | DOOR CAM, BRASS # VARIOUS MODELS |
1 x | DAMPER EXT ROD/PULL RING, UNI# 8.188" LONG EXTENSION ROD |
1 x | TRANSMITTER, PF2 w/ AUX FUNCTION |
1 x | VALVE REGULATOR, LP SIT# S.I.T. 907.204 |
1 x | 30 DEGREE ELBOW KIT |
1 x | Plate Surround Side For S |
1 x | Bottom Slide Rod |
1 x | LEG KIT, SCULPTURED - PEWTER* |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | Handle Asy-sms,tl3,68,xxv |
1 x | FAN, REAR MOUNT F/S WOOD II* |
1 x | MANUAL, OWNERS CAPE COD FWM 2019 |
1 x | CONV PARTS, LP - PSE 564 HONB-GSR2 |
1 x | AUGER FLIGHT SPACER, 5PK# CHECK SR# |
1 x | AIRTUBE, ROLL PINS, PK OF 6# 1/4" dia. x 5/8"PLAIN STEEL |
1 x | CONV KIT, NG 616 GSR2 SERVICE PART |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | Hi-Temp Round Top with Louvered Screen and Slip Section |
1 x | BLOWER STUD PLATE (2) 21 TRV |
1 x | Tl3 Linkage Hardware |
1 x | AIRTUBE KIT, L-6 FLEX-95 # 90-92 SR.#11604-14318 |
1 x | FASTENER - KEPS NUT 5 PK 1/4-20 |
1 x | AUGER MOTOR, ALL PS/PI# EXCEPT 93-96 PI/AGP PS/PI |
1 x | 3-n-1 DOOR SHL HW SM/LG HARDWARE ONLY |
1 x | MANTEL SHIELD* |
1 x | Lava - Bag |
1 x | MAGNET, 1/2" SUPER NEODYM BLK 10 PK - 1/2" DIA X 1/4" THICK. |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | Hi-Temp Round Top with Mesh Screen |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | BURNER, RADIANT LG RADIANT LARGE |
1 x | BRKT, CONTROL VALVE BERK/TOL/PRA |
1 x | 42" Mosaic Masonry™ Bi-Fold Door, Pewter Finish |
2 x | Novasit regulator |
1 x | BRICK-CUT, 9 x 3-5/8 |
1 x | 3L : REAR LOG |
1 x | DAMPER, BYPASS- SLIDER# REVERE(X-NT/ND), 1750-I |
1 x | BURNER O-RING 5-PK - #20 7/8" id x 1" od |
1 x | CONV PARTS, LP - SIT HERT-EF/SAL-EF/36DVXL-EF |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | 30 Degree Firestop Spacer (1ea.) |
1 x | Top Ceramic Purchased(bfc |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | Shroud Leg Spacer Kit (for UL approval of field fab term covers) |
1 x | GASKET, CHANNEL TAPE, 55" BLK 3/4" x 1/8" x 3/16" |
1 x | Novasit Electrode - Short |
1 x | Fem Term-vinyl Ins 25/pk |
1 x | Louver-strips-door(steel) |
2 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | 12B : R/S (ON/OFF SWITCH) |
1 x | CNTRL/ACCESS DR ASS'Y - GSR2 DVS/DVL INSERT GSR-2 ONLY |
1 x | Firebrick Back Assy Servi |
1 x | 8 : PIEZO IGNITOR MANUAL |
1 x | FAN, RADIANT INSERT# LARGE AND SMALL |
1 x | DOOR CAM, BRASS # VARIOUS MODELS |
1 x | Quick Disconnect Pipe Weldment |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | ANCHOR PLATE |
1 x | BRICK-CUT, 9 x 3 |
1 x | CONV PARTS, LP - PSE DVL GSR2 |
1 x | WIRE HRNS, FUSE GS2-GSR2 # PRO-FLAME 2 |
1 x | TOOL (PULL), LPI w/SPRNG HNDL# BYPASS PULL TOOL |
1 x | Ash Pan Weldment - Leg Model |
1 x | INSULATED WALL THIMBLE |
1 x | GSKT, ROPE, DR 7/8" x 64" BLACK# VARIOUS WOOD/PEL/GAS |
1 x | ANDIRON, TRADITIONAL RING* 564 SS |
1 x | BRICK-CUT, 9 x 3-7/8 # |
1 x | CONV PARTS, NG PSE 564 HO HO GRR2/GSR SCR |
1 x | 18" ULTRA TEMP LENGTH |
1 x | BURNER ASS'Y, INNER - 864 ST GS/GS2 |
1 x | 1 : BRICK FILLER (4 PER F/P) |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | Pressure Relief Bolt Round Gasket (Each) 2 Per Unit |
1 x | 24" GALVA TEMP LENGTH |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | Hi-Temp Lg Pyramid Top w/Slip Section (use with all 8" systems) |
1 x | CLIP, FLOOR BRICK - 564SS CLEAN FACE - GSR2 |
1 x | AIR DEFLCTR - LFT EDN / NRFLD w/SCREWS |
1 x | 4 : ODS PILOT ASSEMBLY NG - MANUAL |
1 x | DOOR CAM, BRASS # VARIOUS MODELS |
1 x | STORM COLLAR |
1 x | ANCHOR PLATE |
1 x | MANUAL, FL/LX/X 1986-87 |
1 x | Bulk100-fhn 1/4-20 Z 5 |
1 x | ASHTRAP DOORS, (x2) PS/PI# 1997-2012 / LARGE OR SMALL |
1 x | Glass Clips & Hdwr-1 Set |
1 x | 36" Pipe Length |
1 x | DOOR, WASHER, .390 x .630 SS# PK OF 8 |
1 x | PILOT BRKT, w/ FASTENERS NRTHFLD, EDN, 864HO |
1 x | BRKT, ACCENT LIGHT 616 GSR2 |
1 x | Ul Fdr Snout Gasket-10 Pk |
1 x | Burner tube LP |
1 x | GLASS CLIP SET - 3-n-1 DOOR# LOPI WOOD |
1 x | BLOWER, RT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | 1" Clearance Firestop Spacer ( 1ea.) |
1 x | Conversion Kit, Millivolt, Natural to Propane |
1 x | LOG, LEFT TWIG - LS1 # 1996-2000 |
1 x | Refr Front Ash Lip 42 |
1 x | RESTRCTR CNTRL ASSY DVL/33 INSERT |
1 x | REMOTE, BLK WALL-MOUNT# ALL GS/GSR/GSR2 MODELS |
1 x | 15 : PLUG BUTTON (GAS LINE) WM36/WM36A/WM42II-42A/HT/SX (3/4IN. |
1 x | UNIVERSAL WALL / RESUPPORT ASSY |
1 x | BURNER ASS'Y, EF - 864HO# EMBERFYRE - NG - GS MDLS |
1 x | Roof Flashing 6/12 to12/12 Pitch |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | 19 : TOP LOUVER ASSEMBLY |
1 x | UNIVERSAL ROOF BRACE KIT |
1 x | HB38 GAS BRIDGE-SALES |
1 x | LEVELING BOLT COVER, WD INSERT VARIOUS INSERTS - 2-PK |
1 x | GSKT, DOOR 7/8" x 50' BLACK# ROPE - MISC. GAS/WOOD/PELLET |
1 x | BLOWER, LT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | FLEX PIPE, 3/8"od x 12 BLK NO FITTINGS |
1 x | 1" Clearance Firestop Spacer ( 24ea.) |
1 x | BLOWER MOUNTING BRKT 1995-2000 GAS |
1 x | PILOT ELECTRODE - SIT# SPARK ELECTRODE - SIT PILOT |
1 x | BLOWER BRKT PLATE - BRK/TOL BRKT ONLY - NO HW |
1 x | SNAP-DISC - 120deg NO# WOODSTOVE & INSERT |
1 x | COVER PLATE, OUTER 21TRV ALL TRV MODELS |
1 x | LEVELING BOLT COVER, WD INSERT VARIOUS INSERTS - 2-PK |
1 x | Square Top with Slip Section |
1 x | PILOT ASSY (5-Pk), NG PSE 2-WY# UNIVERSAL |
1 x | Heat Exchange Baffle |
1 x | BRICK-FORMED STEEL, IGNITER - SFW 9 x 4-1/2" - formed steel |
1 x | ACCESS DOOR BRKT, RIGHT 31/33/DVSGS/DVLGS |
1 x | LOG, REAR - LS38 (#1)# |
1 x | 3/8 Od X 1/4 Oal-5 Pack |
1 x | Spacer Griddle Handle-def |
1 x | DIFFUSER UNIVERSAL 18 GA ALZ - 3.639 x 3.232 |
1 x | WALL SUPPORT KIT |
1 x | AUDIO BOARD w/AUDIO PORT 21E# SERVICE PARTS |
1 x | INSULATED TEE PLUG ONLY |
1 x | DOOR HINGE [x1] AVA WD/AGP |
1 x | 20 : DOOR HANDLES (BOLT BAG) WM42II-42/WM42II-42S/HTS/SX-S |
1 x | KNOB (WOOD) w/ SCREW# A/C - ASH/ALDER |
1 x | DEFLECTOR PACK - 430 GSR2 TRADITIONAL LOGSET |
1 x | CONV PARTS, LP - SIT # ALL/BERK/CDR/PRA/TOL/DVSZC-INS |
1 x | Square Top with Slip Section - Black |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | Door Frame Only*** |
1 x | AIRTUBE KIT, L-2 1988# REPLACES WELDED TUBES |
1 x | BLOWER MOUNTING BRKT 1995-2000 GAS |
1 x | Full Skid Of Brick-sales |
2 x | Hearth Refractroy |
1 x | STEPPER, GSR LP CONV 4PK* GSR2 |
1 x | BRUSH, BENT HANDLE # COMBUSTOR/FIREBOX BROOM |
1 x | VENT START COLLAR ASS'Y 616 GSR INSERT |
1 x | GSKT (1), GLASS CLIP, BOTTOM# VARIOUS MODELS |
1 x | CONV PARTS, NG 564SS DX GSR2 DLX SCR MODEL |
1 x | BLOWER-ASS'Y, LEFT - 864HO# SERVICE PARTS |
1 x | BURNER, DVL EMBRFYRE W/LOG II* |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | TALL CONE FLASHING |
1 x | AIR CNTL ROD EXTENSION INT/EXT THREAD - 4.438 x 3/8 |
1 x | # 31 burner orifice |
1 x | BRICK-CUT, 9 x 2-7/16 |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | 22 : COTTAGE CLAY FIREBRICK-CENTER |
1 x | BURNER, RMA RETURN REQUIRED 1996-00, PAN ONLY - 40K |
1 x | Pc45 Bp Front Plate-2 Set |
1 x | BATTERY TRAY, GS - "AA" SERVICE PART |
1 x | BOARD MOUNTING BRACKET 864 HH/ST |
1 x | CLIP, FIREBACK - 2 PK VARIOUS MODELS |
1 x | HB38 RIGHT FLOOR BRICK |
1 x | GSKT, ROPE, DR 7/8" x 64" BLACK# VARIOUS WOOD/PEL/GAS |
1 x | Variable Speed with Wall Switch |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | BI-METALIC DAMPER# 616 GSR/GSR2/4415/3615/6015 |
1 x | PANEL, INSULATION - 3" x 10' # Wood Burning Inserts |
1 x | PRES RELIEF DOOR w/ GSKT # MULTIPLE GAS UNITS 1997 + |
1 x | GSKT CEMENT, 3oz. TUBE# w/BRUSH - UNIVERSAL |
1 x | BRICK-CUT, 4-1/2 x 4-1/2 |
1 x | PILOT ORIFICE, NG - 0.018 PSE# NG PILOT ORIFICE |
1 x | PILOT SHIELD, 864HO-NB DANCING/DIAMOND FYRE BURNER |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | BURNER ASS'Y, DF - REAR# GSR-GSR2 |
1 x | LOG, LEFT TWIG - LS1 # 1996-2000 |
1 x | Burner Orifice # 50 - LP 99/00/01/02/03/04 |
1 x | 30 DEGREE ELBOW KIT- GALVA TEMP |
1 x | CONV PARTS, LP - SIT 616 INSERT- GSR/GSR2 |
1 x | CONV PARTS, NG - SIT/PSE GS-GS2 - NORTHFIELD / EDEN |
1 x | Assy Bdv600 Face Textured |
1 x | 12" Section Hi-Temp Double Wall Pipe Snap Lock |
1 x | Burner tube NG |
1 x | 10 : SCREW NO.6X3/4 PPH YELLOW ZINC |
1 x | Split Stacked Warm Red Masonry Firebrick Walls |
1 x | ACCENT LIGHT v.1 DVL INS DVL INS GSR TO SR# 3403-611520 |
1 x | EZ TOP WITH SPARK ARRESTOR |
1 x | DOOR LATCH STRAP, G5/G11/G13/# G16/G22 - OLD STYLE 1998' UNIT |
1 x | GLASS, SMALL LOPI# 8-7/8 x15-3/8" GSKT NOT INCLD |
1 x | Hopper Handle Pull |
2 x | GLASS RETAINER w/GSKT, 3n1 SML DOOR GSKT ONLY |
1 x | BLOWER MOUNT PLATE - PHD POWER HEAT DUCT |
1 x | BURNER, REAR LOG SHELF# GAS FS - DV/BV 1996-99 |
1 x | AIRTUBE KIT, L-3 1988-91# REPLACES REMOVABLE TUBES |
1 x | Storm Collar (1 ea.) |
1 x | PULL RING, METALLIC BLACK # PAINTED |
1 x | FASTENER - SCW 10 PK 3n1 DOOR# LOPI WD - HWH SWAG 10-24 x 1" |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | BRKT, CONTL MODULE, INS GSR DVS/DVL INSERT |
1 x | Junction Box Kit (Required with Blower) |
1 x | Fitting 1/8" Brass Pipe Adaptor (Located Between Elbows |
1 x | BURNER ASS'Y (EF)# TOL/BERK (2005 - 2008) |
1 x | SET OF CUT BRICK |
1 x | SHL, TOP NRTHFLD NI NEW IRON, RAD MV/GSR2 DLX |
1 x | Millivolt, Propane to Natural (SIT) |
1 x | GLASS GUARD LATCH TOOL |
1 x | HW PACK, LEG CLIP - MOBILE# HOME INSTALLATION |
1 x | BLOWER BRKT, RIGHT T.O.L/BERK |
1 x | Grate Scraper |
1 x | ASH DUMP PLATE, SMALL PS/PI 1997 AND UP |
1 x | HANDLE (SPRING), DOOR - BLACK# 1/2" id x 4.158" LONG |
1 x | BURNER, 564HO DIAMOND FYRE* |
1 x | CONV PARTS, NG RADIANT LARGE RADIANT INS LARGE |
1 x | 36" ULTRA TEMP LENGTH |
1 x | CNTRL MODULE, REMOTE FUNCTN# GSR2 MODELS |
1 x | Air Intake Gasket-set Of6 |
1 x | BURNER RETROFIT - EF, v.1# BRK T0 857740 / PRA TO 801307 |
1 x | Bulk50-hcs1/4-20 X 1/2 G8 |
1 x | GLASS RETAINER ASSY, 3n1 SML# w/GLASS & GASKET |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | GSKT, GLASS 3/4"x50ft. 301-B# ASHESIVE BACK, GLS GSKT |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | Low Profile Dual Blower II |
1 x | FASTENER - HEX NUT 5-PACK# BRASS 3/8-16 - JAMB/TOP-LOCK |
1 x | VINYL SIDING STANDOFF |
1 x | ANDIRON, ARABESQUE* 864 & CLEAN FACE |
1 x | Pellet Power Cords W/ends |
1 x | CNTRL MODULE, BASIC FUNCTION# GSB2 MODELS |
1 x | BURNER, 564HO EMBERFYRE W/LOG* |
1 x | MANUAL, FLEX-95 1989 |
1 x | Round Top with Louvered Screen |
1 x | PILOT SHIELD - UNIVERSAL# VARIOUS MODELS |
1 x | Injector Front#55lp |
1 x | Pressure Relief Door Back 99/00/01/02/03/04 |
1 x | BRICK-WHOLE,9 x 4-1/2 x 1-1/4# STANDARD FIREBRICK |
1 x | STEPPER MOTOR, LP GS# GS1/GSR/GSR2 - 11"-2.9" WC. |
1 x | CONV PARTS, NG - RS 93-95 BV/DVSZC-INSRT 96-00 |
1 x | Standard Single Speed |
1 x | BLOWER, CONV, DVL FS '98 & UP# SALISH/HERITAGE 1998-2009 |
1 x | BLOWER BRKT ASS'Y, LEFT BERK/PRA/CDR/ALEG/TOL |
1 x | BURNER ASS'Y (EF)# EDEN / NORTHFIELD |
1 x | GSKT, GLS 15/16x100" 302-B# VARIOUS WOOD, PELLET & GAS |
1 x | HW PACK, PANEL - MOUNTING HW# SCREWS & NUTS - UNIVERSAL |
1 x | BLOWER ASSY LT - 864/564# FAN KITS 99000156/99000162 |
1 x | Barb Fitting |
1 x | DOOR HINGE [x1] AVA WD/AGP |
1 x | Firestop Thimble (Use when offsetting through a joist) |
1 x | 36" Section Hi-Temp Double Wall Pipe Snap Lock |
1 x | PILOT ASSY (5-Pk), NG PSE 3-WY CYP/33/DVL/864HO - GSR2 |
1 x | GSKT, BYPASS, KAOWOOL# REVERE/X-NT /1750 |
1 x | AUGER ASS'Y, SMALL PS/PI 1997-12, 1-1/4" PITCH FLIGHT |
1 x | Outside Air Adapter Box for 17-VL |
1 x | Round Top with Slip Section & Louvers |
1 x | BLOWER BRKT PLATE - BRK/TOL BRKT ONLY - NO HW |
1 x | Firescreen Panel W/ Pull |
1 x | FIREBOX, CORNER WELD COVERS# LIB/OLY/FREEBY |
1 x | GLASS, AVALON LARGE# 5mm NEOCERAM - 10.125 x 19.000 |
1 x | HW PACK, PANEL - MOUNTING HW# SCREWS & NUTS - UNIVERSAL |
1 x | Square Top |
1 x | HW PACK, LEVELING BOLTS (2) 3/8-16 x 1-1/2" |
1 x | BATTERY TRAY, GS - "AA" SERVICE PART |
1 x | N/S : REAR LOG |
1 x | ORIFICE/MNIFLD ASS'Y, 864TRVGS w/#49 NG ORIFICE |
1 x | GSKT, WIRE PLATE VARIOUS UNITS - 2" x 1-1/4" |
1 x | CNTRL MODULE, BASIC FUNCTION# GSB2 MODELS |
1 x | LOG, RIGHT REAR - LS29 # 21 TRV |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | BRKT, FACE CONNECTOR L/R - SET DVLEF-II/DVLGS/33DVi |
1 x | Screen Uvs27 |
1 x | CONV PARTS, LP - SIT/PSE 33DVi / CYPRESS-GS |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | AIR DEFLECTOR - NG - 33 DVi 33 & DVL DF BURNER |
1 x | INJECTOR, PILOT - LP (#35) # USE w/SIT PILOT ONLY |
1 x | N/S : RIGHT MIDDLE LOG |
1 x | LOG SET, LS29 - 4 PIECE# 21 TRV |
1 x | MAGNET w/SHEATH 1.000 x .750" 1/4" THICK |
1 x | Pilot Ods Rn Mv Op#841182 |
1 x | GSKT, FLUE COLLAR VARIOUS MODELS |
1 x | LOG SPACER, LP - 21TRV GS/GSR2 |
1 x | CONVECTION DUCT (DVL GSR/33i) w/ FASTENERS |
1 x | NAILING BRACKET 21 DV 7.639 x 2.000 |
1 x | Pilot Burner Assy Nat(op8 |
1 x | Orifice Hood ( 0465) V#04 |
1 x | Orifice Hood Lp #69(0 029 |
1 x | Firebrick Rt Side Assy |
1 x | PILOT ASSY, NG - S.I.T. # PRE GREENSMART |
1 x | BRICK RETAINER (2) w/SCW# UNIVERSAL PART |
1 x | MANUAL, DVL FIREPLACE EF 2003 |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | GLASS, 1/4 CRUSHED BLK 10LBS* |
1 x | GLASS w/FRAME - 616 616 GSR INSERT |
1 x | GLASS, 1/4 CRUSHED CBLT 10LBS* |
1 x | AIR CONTROL ASSY, 2006-12 ANS-NT/ND & 1250/i |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | SCREEN, CLEARFIRE, FRONT CYP/GRNFLD 24.500 x 16.250 |
1 x | BURNER ASS'Y, EF - 864HO# EMBERFYRE - NG - GS MDLS |
1 x | RUBBER MOTOR STOP - 2-PK# ALL PELLET - 1990 to PRESENT |
1 x | KNOB (PLASTIC), RHEOSTATS # BLACK w/WHITE LINE - GAS/WOOD |
1 x | VALVE REGULATOR, NG RS# ROBERT SHAW (0.9-3.5") |
1 x | AIR DIVERTER, 864 TRV GS2/GSR2 |
1 x | HW PACK, BLOWER 564/864 FOR NON-GS MODELS ONLY |
2 x | SHL, SIDE LT, GREENFLD Scr OXB OXFORD BROWN w/SCREEN |
1 x | FLEX PIPE, 3/8"od x 28" BLACK NO-FITTINGS |
1 x | LOG SET, LS31 - 9 PIECE 864 ST |
1 x | INJECTOR, PILOT - NG (#62)# USE w/SIT PILOT ONLY |
1 x | PIEZO IGNITER, ALL mv GAS UNITS # w/ RETAINING NUT |
1 x | GSKT, GLS 15/16x54" 302-B# VARIOUS WOOD, PELLET & GAS |
1 x | KNOB, PHENLIC# BLACK - 1" dia |
1 x | GLASS w/GASKET - DVS F/S FRONT VASHON/ALLEGIANCE |
1 x | EXHST/INTAKE CVRS w/GSKTS w/FASTENERS - 564 |
1 x | DIFFUSER UNIVERSAL 18 GA ALZ - 3.639 x 3.232 |
1 x | VALVE REGULATOR, NG RS# ROBERT SHAW (0.9-3.5") |
2 x | SHL, TOP, GRNFLD - PATNIA BRNZ PATINA BRONZE |
1 x | CNTRL MODULE, BASIC FUNCTION# GSB2 MODELS |
1 x | WIRE HRNS, ACCENT LIGHT 616/430 EG MDLS |
1 x | HW PACK, REMOTE - MOD LP GS SERVICE PART |
1 x | DAMPER BLOCK OFF COVER (1) w/ FASTENERS |
1 x | BRUSH, BOTTLE STYLE# UNIVERSAL PS/PI |
1 x | ANDIRON, WROUGHT IRON* 864 & CLEAN FACE |
1 x | MILL-PAC BLACK HI-TEMP SEALANT 1-TUBE, (10.3oz) |
1 x | HINGE PIN, DOOR BLK 4-PK 3/16 x 1-1/2 |
1 x | PIPE ADAPTER-3/8FLRx1/2NPT BRS 45deg FLRD(FEML PIPE THRD) |
1 x | OUTSIDE AIR KIT, WS/CAST PS* |
1 x | LOG, LEFT - LS13 # 36DVXL EF/EF2/HERT EF2/864HH |
1 x | GSKT, INTAKE - 864 864 HH/ST/TRV |
1 x | PILOT ELECTRODE SLEEVE, BLK# BULK LENGTH - 6 FEET |
1 x | GSKT, DOOR 7/8" x 50' BLACK# ROPE - MISC. GAS/WOOD/PELLET |
1 x | FUSE, 3.15AMP 5-PK GS2# GS2 CONTROL BOARD |
1 x | BRKT, FACE MNTNG - L/R# DVS/31 |
1 x | GRMT/SPACER (4) - BLOWER# 1997+ PEL/1995+ GAS |
1 x | BEARING HOLDER, FUEL MTR# AUGER ASSY |
1 x | RESTRICTOR PLATE, INTAKE - EF EMBER FYRE - 564HO |
1 x | STUD PLATE - SIDE GLASS CLIP SPDV/SPTBAY |
1 x | SHL, TOP, GRNFLD CRBN PATINA CARBON PATINA |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | LOG, RIGHT - LS13 # 36DVXL EF/EF2/HERT EF2/864HH |
1 x | LOG, EMBER CHCK #10, LFT LS63# DRIFTWOOD |
1 x | RHEO w/OFF, SQUARE(MM)# w/NUT & WASHER |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | GLASS w/FRAME - 21 TRV SERVICE PART |
1 x | THERMO-PILE - SIT # SIT PILOT 1999-2009 |
1 x | THERMO-COUPLE - RS # DV 95 & UP, B-VENT 96 & UP |
1 x | RESTRICTOR PLATE EXHAUST 564 SS/DF SERVICE PARTS |
1 x | RHEO w/OFF ASS'Y, SQUARE(FM)# 1-FEMALE, 1-MALE CONNECTOR |
1 x | DEFLECTOR PACK, 864HO EF# 96900144 - EF BURNER KIT |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | WIRING KIT, INSERTS* GAS OR PELLET |
1 x | BLOWER, CONV, UNIVERSAL# VARIOUS GAS/PELLET/PHD KIT |
1 x | REMOTE, BLK WALL-MOUNT# ALL GS/GSR/GSR2 MODELS |
1 x | BRKT, FACE, BTM (564/864) SET OF 2 - WILMINGTON |
1 x | GSKT TADPOLE,3/8 x3/4 PSA BLK# 12' BULK LENGTH |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | SPACER, BLACK - INTAKE SHUTR 5-PK |
2 x | SHL, LEG, BRKSHR/GRNFD BRZ BRONZE PATINA |
1 x | WIRE HRNS, JUMPR-REMOTE GSR-2# PRO-FLAME 2 |
1 x | VALVE REGULATOR, LP MAN HI-LO# S.I.T. 907.206 (10.0" - 3.6") |
1 x | PANEL, 430 ONE PC 25 x 38* |
1 x | SHL, LEG - BRKSHR/GRNFD OXB OXFORD BROWN - SCREEN MDL |
1 x | GSKT, BURNER TRAY - 564SS 17" x 10-7/8" |
1 x | FLEX PIPE, 1/2"od x12" BLK w/ 1 FTNG - 9-7/8 / 11-1/8 w/FTNG |
1 x | CONV PARTS, LP VARIOUS MODELS |
1 x | THERMO-PILE - RS# ALL BV/DV w/ROBERT-SHAW PILOT |
1 x | GLASS SPACER, (1) HER FS DV/BV 13-3/16" LONG |
1 x | LIGHT SOCKET, HALOGEN 616/564 HO/CYPRS/GRNFLD |
1 x | PILOT ASSY w/SLEEVE 430/616EG# 2-WY |
1 x | CONV PARTS, NG - SIT 864TRV-GS |
1 x | BRKT, FACE, BTM (564/864) SET OF 2 - WILMINGTON |
1 x | RHEOSTAT WHEEL (1) w/ SPACERS AND COLLAR |
1 x | ASHPAN PAWL - NO KNOB ELAN/400/900 PS-PI 1991-1996 |
1 x | GSKT (10pk), MIXING TUBE# VARIOUS MODELS |
1 x | REMOTE HRNS PLUG, 3-LOOP# VARIOUS GAS MODELS |
1 x | SWITCH, ROCKER - SINGLE POLE# WHITE |
1 x | STEPPER MOTOR, NG GS2# GS2/GSR/GSR2 - 3.5"-1.6" WC |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | BATTERY HOLDER, GSR-2# PRO-FLAME-2 |
1 x | PILOT ASSY, NG PSE 2-WY# � UNIVERSAL |
1 x | ORIFICE, BURNER - No. 64 SERVICE PART |
1 x | GSKT, FLUE ADAPTER 9" x 9" VARIOUS MODELS |
1 x | PILOT SHIELD[v2] 430/616 PSE SR# SPECIFIC |
1 x | LOG, FRONT LEFT - LS31# |
1 x | AUGER FLIGHT 2" PITCH# AGP/FXFR/DRFLD |
2 x | SHL, LEG, BRKSHR/GRNFD SCN CRB CARBON PATINA - GS2 |
1 x | INSULATION (2-Pc.) REAR VENT 21 TRV RV CONVERSION - ALL TRV MD |
1 x | SNAP-DISC - CRMIC 110deg - NO# 2012 to CURRANT - PS/PI |
1 x | IGNITER - 250 WATTS# AGP/DRFLD/FXFRE |
1 x | LAMP SHDE ASS'Y, EDN/NORFLD GS (24") |
1 x | WIRE HRNS, SPLITTER# ON/OFF SWITCH |
1 x | PILOT ELECTRODE COVER TUBE SILICONE TUBE |
1 x | GSKT TAPE, 1/4" X 1/16" WHT 10' BULK LENGTH |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | ANDIRON, WROUGHT IRON* 864 & CLEAN FACE |
1 x | SNAP-DISC BRACKET (NEW STYLE) UNIVERSAL - GAS/PELLET |
1 x | RHEO w/OFF, SQUARE(MM)# w/NUT & WASHER |
1 x | ORIFICE, BURNER - No. 43# 1.180" BRASS HEX (.089 dia) |
1 x | VALVE, NG BV, ROBERTSHW 96-00# w/TCI BLOCK |
1 x | BLOWER-ASS'Y, LEFT - 864HO# SERVICE PARTS |
1 x | HW PACK, REMOTE - MOD LP GS SERVICE PART |
1 x | HEARTH PLATE - 864 TRV GS# SERVICE PART |
1 x | STORM COLLAR |
1 x | AUGER BUSHING PLT, LOWER, SML# (GEARMOTOR) 1997 & UP SM PS/PI |
1 x | HINGE ASS'Y, DOOR - LG/SD BLK SOCKET & PIN |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | GSKT, INTAKE - 864 864 HH/ST/TRV |
1 x | HRD SS SPACERS/SHIMS (5-PK) CHECK SERIAL NUMBER |
1 x | ANDIRON, ARABESQUE* 864 & CLEAN FACE |
1 x | BLOWER ASSY, RT DVS/DVL EG INS# EMBER-GLO MDLS |
1 x | REMOTE WALL MOUNT BRACKET# w/SCRWS GRN SMRT GS |
1 x | AUGER MOTOR, PUSH# FXFR/DRFLD |
1 x | WIRE HRNS, BLOWER 616/430 EG |
1 x | LOG, LEFT TWIG (TOP) - LS31# |
1 x | HANDLE - EXTENSION. HI-LO, SIT VALVE REGULATOR KNOB |
1 x | PILOT ASSY, NG - S.I.T. # PRE GREENSMART |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | GRILL, 864 LOUVER BLACK* |
1 x | THERMO-COUPLE (10Pk) - RS# DV 95 & UP, B-VENT 96 & UP |
1 x | BRKT, FACE CONNECTORS L/R# DVS /EF II/GS/31 |
1 x | LIGHT BULB BASE/SOCKET-2-PIN# BULB BASE,BOTTOM, w/48" LEADS |
1 x | BRKT SET,TOP FACE - 864 WILMINGTON/LEGACY |
1 x | AIR DEFLECTOR - COMBST AIR 31 DVi INSERT |
1 x | REMOTE, BLK WALL-MOUNT# ALL GS/GSR/GSR2 MODELS |
1 x | ROLL PIN - GLS LATCH SPRING PACK OF 5 - 5/32" dia x 3/4" |
1 x | VALVE REGULATOR, LP SIT# S.I.T. 907.204 |
1 x | GSKT, ORIFICE KIT - NG 616/430 GSR-GSR2 INSERT |
1 x | LOG, FRONT RIGHT - LS70 (#10)# (TRADITIONAL) v.2 |
1 x | ORIFICE, BURNER - No. 37 1.180" BRASS HEX (.104 dia) |
1 x | GSKT, BLOCK-OFF, EXHST 21 TRV 8-1/2" x 8-1/2" |
1 x | ORIFICE, BURNER - No. 53 # 1.180" BRASS HEX (.0595 dia) |
1 x | SNAP-DISC BRACKET (NEW STYLE) UNIVERSAL - GAS/PELLET |
1 x | AUGER MOTOR STOP - PUSH VR.2 - CHK SR# |
1 x | FLUE COLLAR ASSY, 864 INTAKE/EXHAUST PIPE |
1 x | LOG SHELF (864 ST) SERVICE PART |
1 x | SWITCH, ROCKER, ON/OFF# SINGLE-POLE, VARIOUS GAS UNITS |
1 x | BLOWER, COMB [vr.1] FXFRE/DRFLD# � FOXFIRE/DEERFIELD |
1 x | SPACER, 1/4 dia. x .312 - BLK 4 PACK - VARIOUS UNITS |
1 x | FLEX PIPE, 3/8 x 8-1/2# w/ ORIFICE MANIFOLD |
1 x | ENAMEL TOUCH-UP - OXFORD BRN# 15 ml BOTTLE |
1 x | INJECTOR, PILOT - NG (#62)# USE w/SIT PILOT ONLY |
1 x | STEPPER MOTOR, NG GS2 4-PK# 1.6"-3.5" WC |
1 x | LOG EMBERS, LARGE BAG # 12oz. BAG |
1 x | TOOL, GLASS LATCH/RESTRICT0R # VARIOUS GAS AND PELLET |
1 x | SCREEN, FRONT, CONVT AIR CYPRESS |
1 x | SHUT-OFF VALVE# VARIOUS GAS UNITS |
1 x | PIPE ADAPTER-3/8FLRx1/2NPT BRS 45deg FLRD(FEML PIPE THRD) |
1 x | PILOT ORIFICE, LP - 0.014 PSE# PSE PILOT ASSY |
1 x | HINGE ASS'Y COMPLT, L/R 21DV/TRV/LG/SD |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | BRKT SET, ANDIRON 864HO - FRNT/BACK |
1 x | MANUAL, FOXFIRE PELLET STOVE 2015 |
1 x | SCREEN FRAME ASSY, 564# SS/DF/DLX/HO/CF2 |
1 x | SCREEN, CLEARFIRE, SIDE - CYP/GRNFLD 16.125 x 11.025 |
1 x | SHL, SIDE LT, GRNFLD SCR CARBON PATINA |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | CONV PARTS, LP - SIT # ALL/BERK/CDR/PRA/TOL/DVSZC-INS |
1 x | PILOT HOOD, 3-WAY SIT # NON-GREENSMART |
1 x | PAINT, METALLIC BLACK 3oz# SPRAY CAN |
1 x | AIR DEFLECTOR, NG - 864HO-EF 864HO-EF w/ LODGE PINE LOGSET |
1 x | WIRE HRNS, POWER GSR2# INCOMING POWER |
1 x | KNOB, RHEOSTAT, PHD - WHITE SERVICE PART |
1 x | SHL, LEG, BRKSHR/GRNFD NWI NEW IRON, - SCREEN MODELS |
1 x | CONV PARTS, LP 864HO EF SCR EMBERFYRE - GSR2 SCR MDL |
1 x | ORIFICE, BURNER - .0625" 1.180" BRASS HEX (.0625 dia) |
1 x | Steel Brick Kit |
1 x | BLOWER CONV, RIGHT# FOXFIRE ONLY |
1 x | GLASS w/GASKET - 564SS NO FRAME |
1 x | SNAP-DISC - 230deg NC# |
1 x | CONTROL PANL, 864/564 AUST 564HO/SS, 864 ST |
1 x | SHL, TOP, GREENFLD NI GS2 SCREEN MODEL |
1 x | STUD PLATE - SIDE GLASS CLIP SPDV/SPTBAY |
1 x | LOG, RIGHT - LS70 (#4)# (TRADITIONAL) v.2 |
1 x | STONE SET, FYRE-STONES A* FOR 564 HO |
1 x | THERMO-PILE (10-PK) - RS# ALL BV/DV/ w/ ROBERT SHAW PILOT |
1 x | GSKT, OVERHEAD LIGHT 2 PACK, 2.86 x 2.86 |
1 x | PATINA FINISH PROTECTANT |
1 x | GRILL, 564 LOUVER BLACK* |
1 x | FLEX PIPE, 3/8"od x8" BLK NO-FITTINGS |
1 x | GSKT, GLASS -TADPOLE [50ft] BLK 50' BULK LENGTH |
1 x | PUSH PLUG, 1/4" dia, BLK FWI/FXFRE |
1 x | FACE HOOKS RT/LT (WLM - 21) 1-SET |
1 x | SHL, SIDE RT, GREENFLD Scr OXB OXFORD BROWN w/SCREEN |
1 x | GSKT, GLS 15/16x100" 302-B# VARIOUS WOOD, PELLET & GAS |
1 x | SHL, FRONT, GRNFLD BRNZ PAT BRONZE PATINA SCR MDL |
1 x | FLEX PIPE, 3/8"od x 28" BLACK NO-FITTINGS |
1 x | PAINT, METALLIC BLACK - 12oz.# SPRAY CAN |
1 x | REAR PANEL, FIREBOX CYPRESS |
1 x | FUSE, 3.15AMP 5-PK GS2# GS2 CONTROL BOARD |
1 x | FIRESTOP ASS'Y 3615,4415,4415ST,6015 HO & 564 SS |
1 x | BLOWER ASSY, LF DVS/DVL EG INS# EMBER-GLO MDLS |
1 x | FLEX PIPE, 3/8"od x 12 BLK NO FITTINGS |
1 x | LOG, EMBER CHNK #9, FRNT LS63# DRIFTWOOD |
1 x | MOTOR STOP KIT UNIVERSAL |
1 x | GLASS, 1/4 CRUSHED BRNZ 10LBS* |
1 x | SCREEN, CLEARFIRE - 564SS 31.874 x 18.625 |
1 x | FRBK MEDIA TRAY REAR 564 DF PAINTED BLACK |
1 x | ORIFICE, BURNER - No. 55 1.180" BRASS HEX (.052 dia) |
1 x | SHL, SIDE, RT GRN NWI SCN NEW IRON - SCREEN MODEL |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | PANEL, CUSTOM 616 4 PACK* 47.5 x 46.5 x 8, UNPAINTED |
1 x | GLASS LATCH - FINGER-PULL# vr.2, 2007+ |
1 x | THERMO-COUPLE - SIT # USE w/SIT PILOT ONLY |
1 x | GSKT, FLUE COLLAR VARIOUS MODELS |
1 x | VALVE REGULATOR, NG SIT# S.I.T. 907.201 (1.6 - 3.5) |
1 x | WIRE, HI-TEMP 18ga 10FT. ACCENT LIGHT ASS'Y 600v/450c |
1 x | GRILL ASS'Y, TOP - 864 TRV/HH/ST |
1 x | SHL,TOP INS, GRNFLD - OXFD TOP INSERT PLATE - REAR VENT |
1 x | PANEL, 616 ONE PC 30.5 x 42* |
1 x | LOG EMBERS, SMALL BAG # 4 oz. bag |
1 x | LOG, RIGHT TWIG - LS38 (#4)# |
1 x | LIGHT BULB, HALOGEN 5PK# 35watt, T4, 120volts, 380 Lumen |
1 x | GLASS w/GASKET - 21DV 21/HDY/SWD |
1 x | BURNER ASS'Y, INNER - 864 ST GS/GS2 |
1 x | FLUE ADAPTER, DV 8" TO 6-5/8"* 810004994 |
1 x | RHEO w/OFF, 90v, RECT (MM)# w/NUT & WASHER |
1 x | BRKT, BLOWER MOUNT RAD 2 INCLUDES FASTENERS AND GROMMETS |
1 x | PILOT ORIFICE, NG - 0.020 PSE# NG PILOT ORIFICE |
1 x | STEPPER MOTOR, NG GS2# GS2/GSR/GSR2 - 3.5"-1.6" WC |
1 x | FIREBACK, LG FS TOP ENAM BLK* CYPRESS / GREENFIELD |
1 x | PIPE ADAPTER, 3/8 FLARE x3/8M 3/8 FLARE x 3/8 MPT - 1/4 FPT |
1 x | GLASS w/GASKET - HER BAY SIDE# (B/DV/DVL)LIMITED AVAILABILITY |
1 x | TRIM, BOTTOM FRONT - 864 BARRIER SCREEN MODELS |
1 x | EXHAUST RESTRICTOR EDEN/NRTHFLD/GRNFLD |
1 x | COVER PLATE w/FASTENERS UNIVERSAL |
1 x | VALVE, TCI BLOCK # B-VENT GAS COMPONENT |
1 x | POWER CORD, w/MOLEX (18 GA) # UNIVERSAL - WOOD & GAS |
1 x | AC ADAPTER, 7v # BASE GRN SMT APPLIANCES ONLY |
1 x | FUSE, 3.15AMP 5-PK GS2# GS2 CONTROL BOARD |
1 x | LOG, LEFT TWIG (BOTTOM) -LS31# |
1 x | GLASS, 1/4 CRUSHED PLAT 10LBS* |
1 x | BOARD MOUNTING BRACKET 864 HH/ST |
1 x | BLOWER, CONV, DVL FS '98 & UP# SALISH/HERITAGE 1998-2009 |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | BLOWER, LT, GAS INS - 2005+ # EF-II/DVS/DVL/31/33 |
1 x | ANDIRON, ARABESQUE* 864 & CLEAN FACE |
1 x | SHUT-OFF VALVE, GAS# 1/2 INLT, 3/8 FLARE TUBE OUTLT |
1 x | BRKT SET, FIREBOX - 864 WILMINGTON/LEGACY |
1 x | VALVE, NG BV, ROBERTSHW 96-00# w/TCI BLOCK |
1 x | VALVE, NG - S.I.T. (3.5-1.6)# S.I.T. 820.704 |
1 x | BRKT SET,TOP FACE - 864 WILMINGTON/LEGACY |
1 x | AUGER MOTOR, METERING# FXFR/DRFLD |
1 x | LOG, FRONT LEFT - LS70 (#9)# (TRADITIONAL) v.2 |
1 x | MANIFOLD COVER PLATE, NG 33i/DVLGSR/864HO/GRNFLD/CYPRS |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | BURNER, RMA RETURN REQUIRED PAN ONLY - 1995-97 |
1 x | MANUAL, NORTHFIELD GS2 2013 |
1 x | WIRE HRNS, SPLITTER# ON/OFF SWITCH |
1 x | ACCESS DOOR BRKT, RIGHT 31/33/DVSGS/DVLGS |
1 x | KIBBLE SHELF, 2-PK NORTHFIELD/EDEN - GS2 |
1 x | BRICK RETAINER (2) w/SCW# UNIVERSAL PART |
1 x | BRKT, PILOT ASSY 430/616EG |
1 x | STEPPER MOTOR, LP GS# GS1/GSR/GSR2 - 11"-2.9" WC. |
1 x | SHL, SIDE RT, GRNFLD SCR CARBON PATINA |
1 x | HANDLE, DOOR - BLK PHENOLIC# VARIOUS MODELS |
1 x | LOG, EMBER CHNK #11, RGT LS63# DRIFTWOOD |
1 x | HEAT SHIELD BLOCK OFF 564SS SERVICE PART |
1 x | LOG, FRONT (CHUNK) - LS13# 36DVXL EF/EF2/HERT EF2/864HH |
1 x | ORIFICE, PILOT LP - .016 # ROBERT SHAW |
1 x | WIRE HRNS, JUMPER, BLWR/PILOT VARIOUS GSR2 MODELS |
1 x | BURNER SKIRT KIT, 864HO EF 96900144 - EF BURNER KIT |
1 x | FLUE ADAPTER, DV 8" TO 6-5/8"* 810004994 |
1 x | LOG, RT END(LG CHUNK) LS31# |
1 x | SHL, TOP INSERT PLATE GREENFIELD NEW IRON |
1 x | LOG, REAR - LS60 (#1)# 430 TRADITIONAL |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | BURNPOT HOLDER FOXFIRE |
1 x | CONV PARTS, NG - SIT 31DVi INSERT |
1 x | HRD ASSEMBLY REPAIR KIT CHECK SERIAL NUMBER |
1 x | PILOT ORIFICE, NG - 0.018 PSE# NG PILOT ORIFICE |
1 x | PORCELAIN TOUCH UP PAINT - BLUE MAJOLICA |
1 x | BURNER ASSY, FRONT# VARIOUS MODELS |
1 x | DAMPER BLOCK OFF COVER (1) w/ FASTENERS |
1 x | CNTRL PANL-ASS'Y, 31/33 DVi GS - SERVICE PART |
1 x | WIRE HRNS, REMOTE GSR-2# PRO-FLAME 2 - 20" |
1 x | GSKT, PILOT ASSY, GS# ALL GREENSMART UNITS |
1 x | RESTRICTOR, INTAKE - 564 GS2/GSR2 - SS-DF-DLX |
1 x | FACE, 34 PROFILE BLACK SCR EG* FOR DVL EMBER-GLO ONLY |
1 x | BURNER, REAR - 31 DVi 31 DVi/DVS DF - GSR & GSR2 |
1 x | BLOWER BRKT ASS'Y, LEFT BERK/PRA/CDR/ALEG/TOL |
1 x | FASTENER - SCW 25 PK HWSHSMS,#8 x 3/8" TYPE B |
1 x | FUSE, 3AMP, 1/4 dia 5-PK# 250-AVC, GLASS TUBE, 3AG |
1 x | FASTENER - KEPS NUT, 10 PK 8-32 |
1 x | FRBK MEDIA TRAY FRNT 564 DF BLACK PAINTED - SERVICE PARTS |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | VALVE, LP BV, '96-00 - DEXEN w/TCI BLOCK |
1 x | BRKT,CMPLT KIT , DVS BK PLT BK PLT-DVS/EF/GS/31 |
1 x | LOG, RIGHT TWIG - LS45 (#6) # |
1 x | FUSE, 3AMP, 1/4 dia 5-PK# 250-AVC, GLASS TUBE, 3AG |
1 x | LOG, FRONT LEFT LS63(#7)# DRIFTWOOD |
1 x | RIVET - BURNER PLUG, 5-PK VARIOUS GAS |
1 x | PILOT TUBE, SIT# USE w/SIT PILOT ASSY ONLY |
1 x | GSKT, BLOCK-OFF, INTAKE 21TRV 8-1/2" x 8-1/2" |
1 x | THERMO-PILE (10Pk) - SIT# SIT PILOT 1999-2009 |
1 x | FRONT PLATE, GS - CNTRL PANEL TOL, EDN, BRKSHRE, NRTHFLD |
1 x | LOG, LEFT TWIG - LS45 (#5)# |
1 x | EMBERS, ROCK-WOOL 50 grams# 8X10 BAG |
1 x | EMBERS, ROCK-WOOL 5 gram# |
1 x | FAN KIT, DVS-EF 2000 # BRK/ALEG/PRA/CDR/TOL |
1 x | ASH CLEANOUT COVER(1) FOXFIRE/AGP INS 5.500 X 3.499 |
1 x | FUSE, 3AMP, 1/4 dia 5-PK# 250-AVC, GLASS TUBE, 3AG |
1 x | SWITCH, SNAP ACTION, MINIATURE VARIOUS MODELS |
1 x | BURNPOT SCRAPER TOOL# AGP/FXFR/DRFLD |
1 x | VALVE TRAY ASS'Y - 1080CF SERVICE PART |
1 x | Log, Right Dfx24c Servic |
1 x | TRIM, FACE ASS'Y, 1080/36 CF-R 2008' |
1 x | WIRE HRNS PIG-TAIL, MALE 3-PIN, JNCTN BOX |
1 x | Ass'y, Screen Frame, Pain |
1 x | WALL PLATE, WHITE (RKR SWTCH) SERVICE PART |
1 x | Snap Disk Bracket Form |
1 x | PANEL, DVL II 4 x 6* |
1 x | PILOT ORIFICE, NG - 0.020 PSE# NG PILOT ORIFICE |
1 x | STOVE PACK, RADIANT, LARGE SERVICE PART |
1 x | PILOT ELECTRODE - SIT# SPARK ELECTRODE - SIT PILOT |
1 x | PILOT ASSY, NG PSE 3-WY # CYP/33/DVL/864HO - GSR2 |
![](images/pixel_black.gif) |
$117,096.49 |
Shipping Charges |